8.8 EH/s of installed and operational self-mining capacity, up 76% Y-o-Y Construction of Building 4 at Lake Mariner substantially completed in June, paving the way to >10.0 EH/s in July 2024 AI/HPC digital infrastructure projects advancing at Lake Mariner EASTON, Md., July 03, 2024 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (“TeraWulf” or the “Company”), owners and operators of vertically integrated, domestic bitcoin mining facilities powered by 95% zero-carbon energy, today provided an un
As of June 2024, the U.S. stock market presents a mixed landscape, with the Nasdaq experiencing a pullback due to a slump in semiconductor stocks, while the Dow Jones Industrial Average shows resilience with notable gains. This varied market environment underscores the importance of considering companies with high insider ownership, which can signal strong confidence in the company's future from those who know it best.
On June 7, 2024, Kenneth Deane, Chief Accounting Officer and Treasurer of TeraWulf Inc (NASDAQ:WULF), executed a sale of 69,996 shares of the company.