We are experiencing some temporary issues. The market data on this page is currently delayed. Please bear with us as we address this and restore your personalized lists.

Canada markets open in 5 hours 36 minutes

Li-FT Power Ltd. (LIFT.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
3.0600+0.0300 (+0.99%)
At close: 03:59PM EDT
Full screen
Previous Close3.0300
Open3.0700
Bid3.0600 x N/A
Ask3.1500 x N/A
Day's Range2.9700 - 3.1000
52 Week Range1.8600 - 8.1400
Volume145,889
Avg. Volume46,807
Market Cap130.764M
Beta (5Y Monthly)0.47
PE Ratio (TTM)21.86
EPS (TTM)0.1400
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • ACCESSWIRE

    LIFT Announces Initial Mineral Resource of 50.4 Million Tonnes at 1.00% Li2O, at the Yellowknife Lithium Project, NWT, Canada

    Highlights: The maiden resource estimate at the Yellowknife Lithium Project represents the 3rd largest hard-rock maiden resource estimate in Canada and the 10th largest hosted in the Western Hemisphere. 6 of the 8 spodumene dykes included in the maiden ...

  • GlobeNewswire

    LIFT reports laboratory metallurgical recoveries averaging 79% producing a high-quality spodumene concentrate grading 5.83% Li2O at the Yellowknife Lithium Project

    VANCOUVER, British Columbia, Sept. 23, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report results from the metallurgical sampling program completed in 2023 and 2024 across eight spodumene deposits within the Yellowknife Lithium Project, Northwest Territories, Canada. Metallurgical test work comprised of heavy liquid separation (HLS) testing, dense media separation (DMS) testing, and batch flotation testing was exe

  • GlobeNewswire

    LIFT quadruples the size of the Cali Property through staking

    VANCOUVER, British Columbia, Sept. 03, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report that the Company has increased its land position at the Cali Project by staking an additional 9,681 hectares of contiguous claims within the Little Nahanni Pegmatite District, Northwest Territories, Canada. The recently staked claims have outcropping spodumene pegmatites which are the continuation of Cali dyke swarm that LIFT

  • GlobeNewswire

    Clean Energy Metals Virtual Investor Conference Presentations Now Available for Online Viewing

    Company Executives Share Vision and Answer Questions Live at VirtualInvestorConferences.comNEW YORK, Aug. 30, 2024 (GLOBE NEWSWIRE) -- Virtual Investor Conferences, the leading proprietary investor conference series, today announced the presentations from the Clean Energy Metals Investor Conference held August 29th are now available for online viewing. REGISTER NOW AT: https://bit.ly/3MpyGsA The company presentations will be available 24/7 for 90 days. Investors, advisors, and analysts may downl

  • GlobeNewswire

    Clean Energy Metals Virtual Investor Conference Agenda Announced for August 29th

    Company Executives Share Vision and Answer Questions Live at VirtualInvestorConferences.comNEW YORK, Aug. 27, 2024 (GLOBE NEWSWIRE) -- Virtual Investor Conferences, the leading proprietary investor conference series announced the agenda for the Clean Energy Metals Virtual Investor Conference to be held August 29th. Individual investors, institutional investors, advisors, and analysts are invited to attend. REGISTER NOW AT: https://bit.ly/3YTUrbr It is recommended that investors pre-register and

  • GlobeNewswire

    Battery & Precious Metals Virtual Investor Conference Presentations Now Available for On-Demand Viewing

    Company Executives Share Vision and Answer Questions Live at VirtualInvestorConferences.comNEW YORK, July 25, 2024 (GLOBE NEWSWIRE) -- Virtual Investor Conferences, the leading proprietary investor conference series, today announced the presentations from the Battery & Precious Metals Virtual Investor Conference held June 23rd & 24th are now available for online viewing. REGISTER OR LOGIN TO VIEW THE PRESENTATIONS AT: https://bit.ly/4cRXPaV The company presentations will be available 24/7 for 90

  • GlobeNewswire

    Battery & Precious Metals Virtual Investor Conference Agenda Announced for July 23rd and July 24th

    Company Executives Share Vision and Answer Questions Live at VirtualInvestorConferences.comNEW YORK, July 18, 2024 (GLOBE NEWSWIRE) -- Virtual Investor Conferences, the leading proprietary investor conference series announced the agenda for the Battery & Precious Metals Virtual Investor Conference to be held on July 23rd and 24th, 2024. Individual investors, institutional investors, advisors, and analysts are invited to attend. REGISTER NOW AT: https://bit.ly/3W9aqkd It is recommended that inves

  • GlobeNewswire

    LIFT To Acquire Shorty West Lithium Claim

    VANCOUVER, British Columbia, July 18, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to announce that it has entered into a mineral property purchase agreement dated July 17 2024 with Infinity Stone Ventures Corp. (CSE: GEMS) to acquire the Shorty West Lithium mineral claim (the “Shorty West Claim”), which is adjacent to the Company’s Yellowknife Lithium Project. As consideration for the Shorty West Claim, the Company w

  • GlobeNewswire

    LIFT intersects 25 m at 1.21% Li2O at its Shorty pegmatite, Yellowknife Lithium Project, NWT

    VANCOUVER, British Columbia, June 11, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 13 drill holes completed at the Shorty, Ki, Echo, BIG East, Fi SW, Nite, and BIG West pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). These drill results are the final batch of results from the winter 2024 drill program. Drilling i

  • GlobeNewswire

    LIFT intersects 33 m at 1.09% Li2O at its Echo pegmatite, Yellowknife Lithium Project, NWT

    VANCOUVER, British Columbia, May 28, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 13 drill holes completed at the Shorty, BIG East, Echo, Fi Main, & Ki pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights: Highlights: