Canada markets closed

Li-FT Power Ltd. (LIFT.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
3.7500+0.1000 (+2.74%)
At close: 03:59PM EDT
Full screen
Previous Close3.6500
Open3.4900
Bid3.7500 x N/A
Ask3.8000 x N/A
Day's Range3.4600 - 3.8000
52 Week Range2.6000 - 10.1900
Volume21,780
Avg. Volume39,871
Market Cap160.25M
Beta (5Y Monthly)N/A
PE Ratio (TTM)26.79
EPS (TTM)0.1400
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • GlobeNewswire

    LIFT intersects 25 m at 1.21% Li2O at its Shorty pegmatite, Yellowknife Lithium Project, NWT

    VANCOUVER, British Columbia, June 11, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 13 drill holes completed at the Shorty, Ki, Echo, BIG East, Fi SW, Nite, and BIG West pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). These drill results are the final batch of results from the winter 2024 drill program. Drilling i

  • GlobeNewswire

    LIFT intersects 33 m at 1.09% Li2O at its Echo pegmatite, Yellowknife Lithium Project, NWT

    VANCOUVER, British Columbia, May 28, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 13 drill holes completed at the Shorty, BIG East, Echo, Fi Main, & Ki pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights: Highlights:

  • GlobeNewswire

    LIFT intersects 35 m at 1.32% Li2O at its Shorty pegmatite, Yellowknife Lithium Project, NWT

    VANCOUVER, British Columbia, May 22, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 12 drill holes completed at the Shorty, BIG East, Echo, Fi Main, & Ki pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights: Highlights: