Canada markets open in 5 hours 40 minutes

OI Aug 2024 21.000 call

OPR - OPR Delayed Price. Currency in USD
Add to watchlist
0.76000.0000 (0.00%)
As of 12:24PM EDT. Market open.
Full screen
Previous Close0.7600
Open0.7600
Bid0.2500
Ask0.4500
Strike21.00
Expire Date2024-08-16
Day's Range0.7600 - 0.7600
Contract RangeN/A
Volume3
Open Interest23
  • GlobeNewswire

    O-I GLASS AND GRIDBEYOND ESTABLISH INNOVATIVE BATTERY STORAGE SYSTEM IN ALLOA, UK

    Energy storage system at O-I’s Alloa, UK, plant helps balance the grid, reduces peak load, optimizes the use of renewable electricity, and increases O-I's resilience against brownoutsPERRYSBURG, OH/ALLOA, UK, June 25, 2024 (GLOBE NEWSWIRE) -- - O-I Glass, Inc. (“O-I Glass” or “O-I”) and GridBeyond plan to implement a groundbreaking battery storage solution at O-I’s Alloa, UK facility. The innovative 8MW battery system and supporting energy management system (EMS) leverages artificial intelligenc

  • Zacks

    O-I Glass (OI) Plans to Invest $65M in Its French Plant

    O-I Glass (OI) to invest in the electrification and decarbonization of its plant in Veauche.

  • GlobeNewswire

    O-I Glass to Invest $65 Million in Electrification and Decarbonization in Veauche, France

    Hybrid flex technology and heat recovery systems to advance sustainability First O-I plant globally to feature hybrid furnace Flexibility to operate furnace with 30% - 70% electricity 43% less on-site CO2 emissions from hybrid-flex technology PERRYSBURG, OH/VEAUCHE, FRANCE, June 18, 2024 (GLOBE NEWSWIRE) -- O-I Glass, Inc. (“O-I Glass” or “O-I”) plans to invest approximately $65 Million into the electrification and decarbonization of its plant in Veauche, France. As the first O-I plant globally