Previous Close | 0.1000 |
Open | 0.1000 |
Bid | 0.0000 |
Ask | 0.0500 |
Strike | 15.00 |
Expire Date | 2024-07-19 |
Day's Range | 0.1000 - 0.1000 |
Contract Range | N/A |
Volume | |
Open Interest | 11 |
Energy storage system at O-I’s Alloa, UK, plant helps balance the grid, reduces peak load, optimizes the use of renewable electricity, and increases O-I's resilience against brownoutsPERRYSBURG, OH/ALLOA, UK, June 25, 2024 (GLOBE NEWSWIRE) -- - O-I Glass, Inc. (“O-I Glass” or “O-I”) and GridBeyond plan to implement a groundbreaking battery storage solution at O-I’s Alloa, UK facility. The innovative 8MW battery system and supporting energy management system (EMS) leverages artificial intelligenc
O-I Glass (OI) to invest in the electrification and decarbonization of its plant in Veauche.
Hybrid flex technology and heat recovery systems to advance sustainability First O-I plant globally to feature hybrid furnace Flexibility to operate furnace with 30% - 70% electricity 43% less on-site CO2 emissions from hybrid-flex technology PERRYSBURG, OH/VEAUCHE, FRANCE, June 18, 2024 (GLOBE NEWSWIRE) -- O-I Glass, Inc. (“O-I Glass” or “O-I”) plans to invest approximately $65 Million into the electrification and decarbonization of its plant in Veauche, France. As the first O-I plant globally