Canada markets closed

NVX Jan 2025 2.500 put

OPR - OPR Delayed Price. Currency in USD
Add to watchlist
0.85000.0000 (0.00%)
At close: 09:31AM EDT
Full screen
Previous Close0.8500
Open0.8500
Bid0.7500
Ask1.2500
Strike2.50
Expire Date2025-01-17
Day's Range0.8500 - 0.8500
Contract RangeN/A
Volume1
Open Interest14
  • GlobeNewswire

    NOVONIX Granted Patent for All-Dry, Zero-Waste Cathode Synthesis

    BRISBANE, Australia, June 27, 2024 (GLOBE NEWSWIRE) -- NOVONIX Limited (NASDAQ: NVX, ASX: NVX) (“NOVONIX” or “the Company”), a leading battery materials and technology company, today announced it has been granted a patent for its proprietary all-dry, zero-waste cathode synthesis technology in Japan. This patent (Patent JP7504195) furthers NOVONIX’s position as a leading provider of innovative technologies serving the electric vehicle and energy storage sectors by utilizing its all-dry, zero-wast

  • GlobeNewswire

    United States Government to Reinstate Section 301 Import Tariffs on Artificial Graphite from China

    BRISBANE, Australia, May 31, 2024 (GLOBE NEWSWIRE) -- NOVONIX Limited (NASDAQ: NVX, ASX: NVX) (“NOVONIX”), a leading battery materials and technology company, today applauded the recent announcement by the United States Trade Representative (USTR) on Section 301 tariffs, removing the current exclusions and reimposing the 25% tariff on artificial graphite and natural graphite powder imported from China effective June 15, 2024.1 In addition, USTR previously announced new tariffs on natural flake g

  • GlobeNewswire

    NOVONIX Completes Independent Engineering Assessment of Riverside Facility

    BRISBANE, Australia, May 30, 2024 (GLOBE NEWSWIRE) -- NOVONIX Limited (NASDAQ: NVX, ASX: NVX) (“NOVONIX” or “the Company”), a leading battery materials and technology company, has announced that an independent assessment of the Company's Riverside production facility in Chattanooga, Tennessee has been completed by Hatch Ltd, a global engineering and consulting firm. The assessment considered various topics including the evaluation of operations, project execution, and financial model assumptions