Canada markets closed

AS Merko Ehitus (MRK1T.TL)

Tallinn - Tallinn Real Time Price. Currency in EUR
Add to watchlist
17.28+0.06 (+0.35%)
At close: 03:53PM EEST
Full screen
Previous Close17.22
Open17.22
Bid17.24 x 0
Ask17.28 x 0
Day's Range17.22 - 17.28
52 Week Range14.28 - 17.50
Volume1,217
Avg. Volume3,254
Market Cap305.856M
Beta (5Y Monthly)0.53
PE Ratio (TTM)6.65
EPS (TTM)2.60
Earnings DateN/A
Forward Dividend & Yield1.30 (7.52%)
Ex-Dividend DateJun 07, 2024
1y Target EstN/A
  • GlobeNewswire

    Changes in the management of groups’ Latvian subsidiaries

    The board of AS Merko Ehitus decided to appoint Egija Smila as the country head for the group's Latvian subsidiaries for a period of three years, with the term of authority beginning on 1 May 2024. The term of office of Andris Bišmeistars, the previous country head of the group's Latvian subsidiaries, ended on 31 March 2024 due to his resigning from the group. Ivo VolkovChairman of the Management BoardAS Merko EhitusPhone: +372 650 1250E-mail: ivo.volkov@merko.ee AS Merko Ehitus (group.merko.ee)

  • GlobeNewswire

    Launch of the sixth stage of the Uus-Veerenni residential project (Tallinn, Estonia)

    Tiiu 14-1 Tiiu 14 visualisation. Tiiu 14-2 Tiiu 14 visualisation. OÜ Merko Kodud, part of AS Merko Ehitus group, has decided to launch the construction of the sixth stage of the Uus-Veerenni residential development project in the city centre of Tallinn. As part of this, an apartment building with a total of 63 apartments will be completed in the summer of 2026. The 8-storey energy class A building at Tiiu 14 (merko.ee/uus-veerenni) will have apartments ranging in size from 35 to 115 square metre

  • GlobeNewswire

    Construction contract in Latvia (solar panel power plant in Vārme parish)

    On 18 April 2024, PS MB.MEE, part of AS Merko Ehitus group, and SIA SP Venta, which sole shareholder and financier of the project development is UAB Ignitis renewables, entered into a contract to for the construction of solar panel power plant located in Vārme parish, Kuldīga district, Latvia.The works include installation of solar panels with total capacity of 93.5 MW DC, 18 medium-voltage power stations, 232 combiner boxes, irradiance sensors, weather stations, construction of access roads, dr