Previous Close | 0.1200 |
Open | 0.1150 |
Bid | 0.1100 x N/A |
Ask | 0.1150 x N/A |
Day's Range | 0.1000 - 0.1150 |
52 Week Range | 0.0400 - 0.1400 |
Volume | |
Avg. Volume | 270,622 |
Market Cap | 26.042M |
Beta (5Y Monthly) | 2.36 |
PE Ratio (TTM) | N/A |
EPS (TTM) | N/A |
Earnings Date | N/A |
Forward Dividend & Yield | N/A (N/A) |
Ex-Dividend Date | N/A |
1y Target Est | N/A |
INCLUDING 2 METERS AT 3.95% CU EQ AND MULTIPLE 2 METRES INTERSECTIONS OVER 1.00% CU EQSignificant copper and molybdenum intersections include: HM19: 116 m from near surface @ 0.54% CuEq HM20: 26.00 m @ 0.44% CuEq HM24: 44.00 m 0.32% CuEqHM36: 207 m @ 0.49% Cu Eq including 92.00 m @ 0.58% CuEq HM37: 255 m from surface @ 0.36% CuEq including 38.00 m @ 0.45% and 98.00 m @ 0.44% CuEqAll drill intercepts included multiple + 2 metre samples with > 1.00% CuEq with one interval returning 3.95% CuEq, the
Significant copper and molybdenum intersections include: HM17: 0.93% CuEq over 12 meters from near surface including 4 m @ 1.52% CuEq.HM32: 0.43% CuEq over 98.00 m including 4 m @ 1.12% CuEq, 2.00 m @ 1.47%.HM33: 0.37% CuEq over 34 m including 8 m at 0.49% CuEq. VANCOUVER, British Columbia, April 10, 2024 (GLOBE NEWSWIRE) -- Koryx Copper Inc. ("Koryx" or “the Company") (TSX-V: KRY) announces the fourth assay results from its current drilling program at its Haib Copper project in southern Namibia
Significant copper and molybdenum intersections include: HM34: 1.06% CuEq over 16 metres from near surface including 8 m @ 1.71% CuEq; and 0.40% CuEq over 168.60 m including 2 m @ 1.50% CuEq, 2 m @ 1.48% CuEq, and 2 m @ 1.02%.HM38: 0.73% CuEq over 34.00 m including 2 m @ 2.28% CuEq, 2 m @ 1.32% CuEq, 4 m @ 1.23% CuEq; and 0.33% CuEq over 50 m.HM39: 0.37% CuEq over 50 m including 4 m at 1.16% CuEq. VANCOUVER, British Columbia, April 04, 2024 (GLOBE NEWSWIRE) -- Koryx Copper Inc. ("Koryx" or “the