Previous Close | 16.22 |
Open | 16.22 |
Bid | 16.52 x 0 |
Ask | 16.71 x 0 |
Day's Range | 16.22 - 16.60 |
52 Week Range | 10.00 - 22.65 |
Volume | |
Avg. Volume | 6,535 |
Market Cap | 1.609B |
Beta (5Y Monthly) | N/A |
PE Ratio (TTM) | N/A |
EPS (TTM) | -2.68 |
Earnings Date | N/A |
Forward Dividend & Yield | N/A (N/A) |
Ex-Dividend Date | N/A |
1y Target Est | N/A |
Figure 1. Location of the Langis Project, Ontario. Figure 2. Collar Locations, Drill Traces and UG-Workings Projected to Surface at the Langis Project. Figure 3 Collar Locations, Assays and UG Workings Projected to Surface at the Langis Project. Figure 4. Shaft 6 Collar Locations and Assays at the Langis Project. Figure 5. High-grade cobalt intercept from hole LM-22-265. Figure 6. Native Silver & Cobalt Mineralization from hole LM-22-283 at 172.95m Depth. VANCOUVER, British Columbia, March 20, 2
Ivanhoe Electric (NYSE American:IE)(TSX:IE) Executive Chairman, Robert Friedland and President and Chief Executive Officer, Taylor Melvin are pleased to announce that Patrick Loftus-Hills is joining the Company's Board of Directors and will serve on the Compensation and Nominating Committee.
Ivanhoe Electric (NYSE American:IE)(TSX:IE) Executive Chairman Robert Friedland and President and Chief Executive Officer Taylor Melvin are pleased to provide an update on drilling operations, including visual confirmation of the presence of soluble copper mineralization at the Typhoon™-identified Texaco Ridge Exploration Area, within the Santa Cruz Copper Project, located west of Casa Grande, Arizona.