Advertisement
Canada markets closed
  • S&P/TSX

    22,308.93
    -66.90 (-0.30%)
     
  • S&P 500

    5,222.68
    +8.60 (+0.16%)
     
  • DOW

    39,512.84
    +125.08 (+0.32%)
     
  • CAD/USD

    0.7317
    +0.0006 (+0.08%)
     
  • CRUDE OIL

    78.20
    -1.06 (-1.34%)
     
  • Bitcoin CAD

    83,103.41
    -2,818.32 (-3.28%)
     
  • CMC Crypto 200

    1,261.37
    -96.64 (-7.12%)
     
  • GOLD FUTURES

    2,366.90
    +26.60 (+1.14%)
     
  • RUSSELL 2000

    2,059.78
    -13.85 (-0.67%)
     
  • 10-Yr Bond

    4.5040
    +0.0550 (+1.24%)
     
  • NASDAQ

    16,340.87
    -5.40 (-0.03%)
     
  • VOLATILITY

    12.55
    -0.14 (-1.10%)
     
  • FTSE

    8,433.76
    +52.41 (+0.63%)
     
  • NIKKEI 225

    38,229.11
    +155.13 (+0.41%)
     
  • CAD/EUR

    0.6789
    +0.0011 (+0.16%)
     

Stroud Resources Commences Phase 2 Drilling Program, Santo Domingo Project, Mexico

Stroud Resources
Stroud Resources

Figure 1.

Locations of all 2021 Phase 1 diamond drill holes completed on the Santo Domingo Silver Property, the main mineralized vein systems (red dashes), and historical drill holes (black).
Locations of all 2021 Phase 1 diamond drill holes completed on the Santo Domingo Silver Property, the main mineralized vein systems (red dashes), and historical drill holes (black).

TORONTO, Feb. 24, 2022 (GLOBE NEWSWIRE) -- Stroud Resources Ltd. (TSXV:SDR) (“Stroud” or the “Company”) is pleased to announce that it has begun its Phase 2 diamond drilling program on its Santo Domingo Silver Property (“Santo Domingo” or the “Property”), located in Hostotipaquillo Region of Jalisco, Mexico. A 3,500 m program is planned for this phase of drilling, targeting the newly discovered Zopilote Vein (previously “New Vein”), the Guadalupe Vein and the La Raya Vein on which there is a current National Instrument 43-101 mineral resource estimate (see Stroud news releases dated 20 November 2017).

ADVERTISEMENT

In its 2021 Phase 1 diamond drilling program, the Company completed 7,702.55 metres in 21 completed diamond drill holes and 383 metres in 5 abandoned holes. (Table 1; Figure 1). Assay results received to date are summarized in Table 2, with the results from 6 drill holes pending. Parameters for the 21 drill holes completed in 2021 are available on the Company website (www.stroudsilver.com).

The Phase 1 drilling program was successful in exploring the extent of known vein system-hosted silver mineralization on the Property and identified additional silver mineralized zones and vein systems such as Zopilote, which appear to strike parallel to the existing La Raya and Guadalupe silver vein systems (Figure 1).

The Company’s current Drilling Permit covers 13 drill pads (drill setups) located across the Property. A second drilling permit will be submitted seeking additional drill pad locations to facilitate further delineation of the three known mineralized vein systems and other exploration targets.

Table 1. Summary of 2021 Phase 1 diamond drilling on the Santo Domingo Silver Project, Mexico.

Drill Hole

UTM_mE

UTM_mN

Elevation (m)

Az

Dip

Length (m)

Hole Type

Vein System

Status

SD-21-46

606383.07

2334194.03

1150.58

-50

230

308.50

Exploration

Guadalupe

Completed

SD-21-47

606383.07

2334194.03

1150.58

-65

230

350.00

Exploration

Guadalupe

Completed

SD-21-48

606383.07

2334194.03

1150.58

-80

230

375.00

Exploration

Guadalupe

Completed

SD-21-49

606386.23

2334189.21

1151.26

-65

50

333.00

Exploration

La Raya FW

Completed

SD-21-50

606785.16

2334205.80

984.54

-52

298

237.00

Delineation

La Raya

Completed

SD-21-51

606438.24

2334460.73

1036.04

-40

222

58.30

Exploration

Guadalupe

Abandoned

SD-21-52

606785.16

2334205.80

984.54

-64

279

225.00

Delineation

La Raya

Completed

SD-21-53

606496.37

2334188.22

1143.33

-55

230

384.00

Exploration

Guadalupe

Completed

SD-21-54

606496.37

2334188.22

1143.33

-65

230

324.00

Exploration

Guadalupe

Completed

SD-21-56

606496.37

2334188.22

1143.33

-85

230

292.50

Exploration

Guadalupe

Completed

SD-21-57

606438.24

2334460.73

1036.04

-72

230

317.30

Exploration

Guadalupe

Completed

SD-21-58

606209.14

2334152.99

1128.46

-40

240

353.00

Exploration

Zopilote

Completed

SD-21-68

606505.88

2334473.86

1025.02

-50

230

55.50

Exploration

Guadalupe

Abandoned

SD-21-68A

606505.88

2334473.86

1025.02

-55

230

405.00

Exploration

Guadalupe

Completed

SD-21-69

606523.85

2334431.34

1044.53

-50

230

183.00

Exploration

Guadalupe

Completed

SD-21-70

606523.85

2334431.34

1044.53

-50

230

69.00

Exploration

Guadalupe

Abandoned

SD-21-71

606618.46

2334416.30

991.20

-50

230

296.50

Delineation

La Raya

Completed

SD-21-72

606441.38

2334206.86

1146.00

-65

230

99.00

Exploration

Guadalupe

Abandoned

SD-21-73

606498.41

2334181.92

1143.64

-65

50

423.00

Exploration

La Raya FW

Completed

SD-21-74

606441.38

2334206.86

1146.00

-65

50

403.00

Exploration

La Raya FW

Completed

SD-21-75

606785.16

2334205.80

984.54

-50

285

330.00

Delineation

La Raya

Completed

SD-21-80

606070.17

2334155.96

1159.49

-50

230

534.00

Exploration

Zopilote

Completed

SD-21-81

606070.17

2334155.96

1159.49

-70

230

540.00

Exploration

Zopilote

Completed

SD-21-82

606070.17

2334155.96

1159.49

-65

50

537.00

Exploration

Zopilote

Completed

SD-21-83

606121.65

2334009.35

1152.00

-50

230

100.95

Exploration

Zopilote

Abandoned

SD-21-84

606327.13

2334143.84

1165.92

-55

230

552.00

Exploration

Zopilote

Completed

Table 2. Summary of results from Phase 1 drill core assays received to date.

Drill Hole

From (m)

To (m)

Length (m)1

Au (g/t)

Ag (g/t)

AgEq (g/t)2

Vein System

SD-21-46

148.15

149.30

1.15

0.43

53.10

85.35

Guadalupe W

and

160.80

162.70

1.90

0.73

101.79

156.42

Guadalupe W

and

236.30

236.70

0.40

2.17

243.00

405.75

Guadalupe W

SD-21-49

87.00

89.15

2.15

0.32

70.20

94.20

Guadalupe

SD-21-49

103.45

105.00

1.55

0.01

624.00

624.75

Guadalupe

SD-21-49

131.05

133.75

2.70

0.13

42.77

52.29

Guadalupe

SD-21-50

10.65

21.00

10.35

1.22

138.48

229.88

La Raya HW

incl.

12.00

13.40

1.40

3.91

209.00

502.25

La Raya HW

incl.

13.40

14.80

1.40

0.97

336.00

408.75

La Raya HW

and

119.25

122.35

3.10

0.40

56.38

86.72

La Raya

SD-21-51

24.00

42.00

18.00

0.13

109.39

119.06

La Raya

incl.

27.00

30.00

3.00

0.18

308.00

321.50

La Raya

incl.

36.00

40.30

4.30

0.14

145.00

155.50

La Raya

SD-21-51

44.50

51.00

6.50

0.12

51.33

60.16

La Raya

incl.

44.50

48.00

3.50

0.15

80.50

91.75

La Raya

SD-21-51

57.00

58.50

1.50

0.09

44.70

51.45

La Raya

SD-21-52

10.80

25.90

15.10

1.11

112.67

195.76

La Raya

incl.

10.80

21.30

10.50

1.36

137.52

239.88

La Raya

incl.

18.50

19.90

1.40

3.07

130.00

360.25

La Raya

SD-21-52

53.10

54.95

1.85

0.18

67.60

81.10

La Raya

SD-21-52

77.95

84.70

6.75

0.21

35.33

51.24

La Raya

incl.

77.95

79.30

1.35

0.76

54.90

111.90

La Raya

SD-21-52

100.50

109.25

8.75

0.53

137.75

177.48

La Raya

incl.

100.50

105.80

5.30

0.83

213.90

276.40

La Raya

SD-21-52

113.95

114.25

0.30

0.37

81.70

109.45

La Raya

SD-21-52

121.25

122.65

1.40

0.05

26.50

30.25

La Raya

SD-21-52

132.85

134.20

1.35

0.16

71.30

83.30

La Raya

SD-21-57

6.00

10.55

4.55

0.50

138.19

175.75

La Raya

SD-21-57

12.60

13.25

0.65

0.18

50.40

63.90

La Raya

SD-21-57

14.60

20.70

6.10

1.05

197.38

276.34

La Raya

incl.

14.60

17.65

3.05

2.02

362.00

513.50

La Raya

SD-21-57

183.35

184.40

1.05

0.04

64.70

67.70

Guadalupe

SD-21-57

197.05

204.95

7.90

0.31

35.12

58.55

Guadalupe

incl.

200.50

203.40

2.90

0.63

61.52

108.52

Guadalupe

SD-21-57

213.70

217.10

3.40

0.92

67.35

136.63

Guadalupe

incl.

213.70

214.85

1.15

1.72

102.00

231.00

Guadalupe

SD-21-57

233.10

243.10

10.00

0.07

53.16

58.71

Guadalupe

incl.

233.10

241.10

8.00

0.08

56.95

63.14

Guadalupe

SD-21-57

259.60

260.80

1.20

0.26

45.25

64.94

Guadalupe

SD-21-58

265.30

267.05

1.75

0.32

32.40

56.40

Zopilote

SD-21-58

279.30

283.65

4.35

0.35

33.40

60.01

Zopilote

incl.

282.60

283.65

1.05

1.03

96.10

173.35

Zopilote

SD-21-58

291.60

293.35

1.75

0.33

39.20

63.95

Zopilote

SD-21-68A

no significant assays

SD-21-69

97.30

98.30

1.00

0.16

37.50

49.50

La Raya

and

99.40

101.60

2.20

0.12

36.30

45.30

La Raya

and

109.55

110.70

1.15

0.21

111.00

126.75

La Raya FW

and

128.55

129.70

1.15

0.18

39.70

53.20

La Raya FW

and

138.45

139.65

1.20

0.17

25.80

38.55

La Raya FW

SD-21-69

148.10

161.35

13.25

1.05

80.86

159.98

Guadalupe E

incl.

152.90

158.90

6.00

1.45

122.18

230.78

Guadalupe E

incl.

152.90

154.10

1.20

2.76

171.00

378.00

Guadalupe E

SD-21-69

165.25

166.45

1.20

0.07

51.00

56.25

Guadalupe E

and

170.15

172.65

2.50

0.08

127.05

133.05

Guadalupe E

SD-21-71

8.40

12.60

4.20

0.15

31.80

43.05

La Raya

SD-21-71

16.80

41.00

24.20

0.31

201.14

224.10

La Raya

incl.

19.00

37.30

18.30

0.34

248.57

273.81

La Raya

incl.

21.40

22.45

1.05

0.48

582.00

618.00

La Raya

incl.

26.70

27.80

1.10

0.25

557.00

575.75

La Raya

incl.

31.20

34.60

3.40

0.20

206.00

221.00

La Raya

SD-21-71

108.50

120.65

12.15

0.30

60.58

83.09

La Raya

incl.

109.60

110.70

1.10

1.16

140.00

227.00

La Raya

incl.

119.50

120.65

1.15

0.34

101.00

126.50

La Raya

SD-21-71

275.10

276.35

1.25

0.51

34.90

73.15

Guadalupe

SD-21-73

no significant assays

SD-21-75

65.10

68.55

3.45

1.31

71.07

169.07

La Raya

incl.

65.10

66.25

1.15

0.54

103.00

143.50

La Raya

SD-21-75

69.70

72.00

2.30

0.28

44.15

64.78

La Raya

SD-21-75

75.15

77.55

2.40

1.81

48.13

183.78

La Raya

SD-21-75

80.25

99.80

19.55

1.31

76.50

174.53

La Raya

incl.

81.65

82.65

1.00

2.17

114.00

276.75

La Raya

incl.

86.80

87.85

1.05

1.03

120.00

197.25

La Raya

incl.

91.45

93.55

2.10

0.55

111.50

152.38

La Raya

incl.

95.75

97.10

1.35

0.85

169.00

232.75

La Raya

SD-21-80

264.00

264.35

0.35

0.51

24.80

63.05

Zopilote Zn

SD-21-81

172.60

173.40

0.80

0.22

63.20

79.70

Zopilote HW

SD-21-81

175.15

185.10

9.95

1.51

258.42

371.60

Zopilote

incl.

176.05

181.10

5.05

2.05

391.53

545.14

Zopilote

incl.

176.05

177.05

1.00

4.71

834.00

1,187.25

Zopilote

incl.

184.20

185.10

0.90

3.17

319.00

556.75

Zopilote

SD-21-81

198.70

201.60

2.90

0.48

148.14

184.26

Zopilote FW

incl.

200.80

201.60

0.80

0.63

198.00

245.25

Zopilote FW

SD-21-81

295.85

297.95

2.10

0.19

38.40

52.65

Zopilote Zn

SD-21-82

247.80

248.95

1.15

0.54

37.90

78.40

Zopilote HW

SD-21-84

330.70

332.25

1.55

0.14

50.80

61.30

Zopilote HW

1drill core lengths are not true widths and are reported as core intervals.
2AqEq calculated using a silver to gold ratio of 75:1 and assuming recoveries of 100%.

A map accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/7b843717-312b-4042-a2c4-c6cba75b58c4

Dr. Scott Jobin-Bevans (P.Geo.), President and a Director of Stroud, is the Qualified Person as defined by National Instrument 43-101 and is responsible for the technical information contained in this news release.

About Stroud Resources Ltd.
Stroud Resources is a TSXV listed company (TSXV:SDR) focused on the exploration and development of its Santo Domingo epithermal silver project in central Mexico.

For more information, please visit www.stroudsilver.com or contact Mirsad Jakubovic, Chief Financial Officer, Stroud Resources Ltd., Tel: 1-416-888-8731, mirsad@cpamba.ca.

THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

The information contained herein contains "forward-looking statements" within the meaning of applicable securities legislation. Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. Any statements that express predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be “forward-looking statements”.

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation, risks and uncertainties relating to the interpretation of the drill results, geology, grade and continuity of mineral deposits. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty to forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances. Actual events or results could differ materially from the Company’s expectations or projections.