Advertisement
Canada markets closed
  • S&P/TSX

    22,308.93
    -66.90 (-0.30%)
     
  • S&P 500

    5,222.68
    +8.60 (+0.16%)
     
  • DOW

    39,512.84
    +125.08 (+0.32%)
     
  • CAD/USD

    0.7317
    +0.0006 (+0.08%)
     
  • CRUDE OIL

    78.20
    -1.06 (-1.34%)
     
  • Bitcoin CAD

    83,343.74
    -2,696.91 (-3.13%)
     
  • CMC Crypto 200

    1,261.07
    -96.94 (-7.14%)
     
  • GOLD FUTURES

    2,366.90
    +26.60 (+1.14%)
     
  • RUSSELL 2000

    2,059.78
    -13.85 (-0.67%)
     
  • 10-Yr Bond

    4.5040
    +0.0550 (+1.24%)
     
  • NASDAQ

    16,340.87
    -5.40 (-0.03%)
     
  • VOLATILITY

    12.55
    -0.14 (-1.10%)
     
  • FTSE

    8,433.76
    +52.41 (+0.63%)
     
  • NIKKEI 225

    38,229.11
    +155.13 (+0.41%)
     
  • CAD/EUR

    0.6789
    +0.0011 (+0.16%)
     

Alpha Exploration Announces Final Drilling Results from Maiden Drill Program at Aburna Gold Prospect

Calgary, Alberta--(Newsfile Corp. - June 27, 2022) - Alpha Exploration Ltd. (TSXV: ALEX) ("Alpha" or the "Company") is pleased to announce final results from the first drilling program on its Aburna gold prospect, part of the Company's 100% owned Kerkasha Project, Eritrea. A program consisting of 19 reverse-circulation drill holes was completed in February and March this year and results from 18 of these holes were announced on May 3 and May 25, 2022. Now assay results have been received from the final hole ABR-015.

Highlights

  • Drill hole ABR-015 in the Aburna Central area intersected 3 gold mineralized zones: 7 meters at 3.40 g/t gold, 17 meters at 0.35 g/t gold and 27meters at 0.51 g/t gold - see Table 1 below for details.

ADVERTISEMENT

Table 1 - Summary of Best Intervals from Aburna Drill Hole ABR-015

Hole Number

From (m)

To (m)

Interval (m)*

Au (g/t)

Area

ABR-015

17

24

7

3.40

Aburna Central

and

56

73

17

0.35

Aburna Central

and

87

114*

27

0.51

Aburna Central

 

*Note that at this early stage of exploration the true width of the mineralization is uncertain, but it is estimated to be 70 to 80% of reported intervals. Intervals are calculated with a start and end value of not less than 0.20g/t Au and a maximum internal dilution of 2 m.

Note* Drill Hole ABR-015 was drilled to 114 meters (end of hole) with the last assay being 0.73 g/t gold.

Table 2: Summary of Best Intervals from Aburna Drill Holes ABR-001 to ABR-019

Hole Number

From (m)

To (m)

Interval (m)*

Au (g/t)

Area

ABR-001

2

16

14

0.87

Hill 52

and

37

45

8

1.58

Hill 52

ABR-002

2

7

5

3.65

Hill 52

and

14

18

4

1.38

Hill 52

and

64

65

1

1.08

Hill 52

and

69

72

3

1.90

Hill 52

ABR-003

89

91

2

1.43

Hill 52

ABR-004

14

16

2

3.00

Hill 52

and

21

22

1

1.44

Hill 52

ABR-005

6

21

15

5.85

Hill 52

and

46

47

1

4.48

Hill 52

and

25

26

1

2.43

Hill 52

and

55

57

2

4.65

Hill 52

and

64

65

1

3.31

Hill 52

ABR-006

27

28

1

1.12

Hill 52

and

136

137

1

3.31

Hill 52

ABR-007

23

24

1

1.85

Hill 52

ABR-008

49

59

10

5.24

Celebration Hill

and

85

86

1

1.57

Celebration Hill

ABR-009

-

-

-

-

No significant assays

ABR-010

-

-

-

-

No significant assays

ABR-011

59

60

1

1.77

Celebration Hill

ABR-012

58

59

1

1.49

Celebration Hill

ABR-013

-

-

-

-

No significant assays

ABR-014

-

-

-

-

No significant assays

ABR-015

17

24

7

3.40

Aburna Central

and

56

73

17

0.35

Aburna Central

and

87

114 (EOH)

27

0.51

Aburna Central

ABR-016

79

84

5

0.52

Hill 52

ABR-017

11

20

9

0.42

Hill 52

and

53

61

8

0.94

Hill 52

and

71

76

5

1.94

Hill 52

ABR-018

7

24

17

0.39

Hill 52

and

47

69

22

4.50

Hill 52

ABR-019

No

significant

assays

0

Aburna Central

 

*Note that at this early stage of exploration the true width of the mineralization is uncertain, but it is estimated to be 70 to 80% of reported intervals. Intervals are calculated using a 0.2 g/t Au cut-off and a maximum internal dilution of 2m

Michael Hopley, Alpha President & CEO said, "I believe that Aburna is becoming a major gold discovery for Alpha. Latest results from drill hole ABR-0015 shows more wide zones of gold mineralization which warrant further drilling. Overall, the first drilling campaign at Aburna has been very successful and has shown that at least three areas, Hill 52, Celebration Hill and Aburna Central, on the very large Aburna gold prospect are returning very encouraging drill results. We plan to start follow-up drilling at Aburna in the next few weeks."

Aburna Gold Prospect

Aburna Gold Prospect

The Aburna gold prospect is located on the western side of the Company's large Kerkasha Exploration License. Gold was mined at Aburna in the 1920s by Italian colonial miners and more recently by local artisanal miners. Earlier work by Alpha has identified gold mineralization over an area of approximately 4 km by 2 km northeast of the colonial Mine. Gold mineralization at Aburna is orogenic-type associated with three major NE-SW oriented shear zones. Recent work by Alpha has included continuous 1-m long sub-surface channel and trench sampling (See press releases on 4th November 2021 and 10th February 2022). Results have defined six prospective sub-areas namely: Hill 52, Saddle Workings, Channel 12 NE, Celebration Hill, Pad 2 and Aburna Central - (see Map 1 below). In addition, consultant structural Geologist Dr. Ghislain Tourigny has completed detailed geological mapping of all these areas.

These latest results are from ABR-015 and are summarized in Table 1. Assay results from drill holes at Aburna are summarized in Table 2.

Map 1 Aburna Gold Prospect

Map 1 above shows 6 prospective areas at Aburna (red ellipsoids) with drill hole locations to date on geology

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/8361/129135_78ed85961485d8b4_001full.jpg

Map 4 Aburna Central Area Drill Plan Map

Map 2 above shows the location and surface projection of all drill holes at the Aburna Central area as well as lithology and gold assays per meter, in histogram form.

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/8361/129135_78ed85961485d8b4_002full.jpg

Notes

Sampling, Sub-sampling and Analysis

Geological consultants from RSC were responsible for the design of a strict QA/QC program consistent with industry best practice. Drilling was by reverse-circulation. Samples were split at the rig using a Metzke splitter, before being transported to a secure location for logging.

All samples were submitted to Nabro Laboratories Limited (Nabro), Asmara, Eritrea, for sample preparation. Samples were crushed (to 90% passing 2.8 mm) and pulverised (to 85% passing 75 µm). Two scoop samples were taken from the pulveriser bowl: approximately 120 g for laboratory analysis and approximately 100 g for portable X-ray fluorescence (pXRF) analysis. The coarse and pulp rejects were stored at a warehouse in Asmara. The Company inserted certified reference material from OREAS (www.ore.com.au) into the sample stream, while Nabro inserted barren granodiorite material into the sample stream as a blank.

Drill samples were shipped to ALS Geochemistry (ALS), Loughrea, Ireland, for analysis. ALS analyzed all drill samples for gold by method Au-AA26 (50 g charge fire assay, AAS finish). ALS is independent of the Company and its quality management systems framework is accredited to ISO/IEC 17025:2005 or certified to ISO 9001:2015 standards.

Table 2 Drill Collar Data

Prospect

Hole

Type

East
(UTM)

North
(UTM)

RL

Azimuth
(°)

DIP
(°)

Started

Ended

Depth
(m)

Aburna

ABR001

RC

340821

1651448

920

315

-50

2/26/2022

2/26/2022

78

Aburna

ABR002

RC

340852

1651421

942

315

-50

2/27/2022

2/27/2022

108

Aburna

ABR003

RC

340875

1651392

937

315

-50

2/28/2022

2/28/2022

150

Aburna

ABR004

RC

340904

1651359

946

315

-50

1/3/2022

1/3/2022

84

Aburna

ABR005

RC

340873

1651265

965

315

-50

3/2/2022

3/4/2022

222

Aburna

ABR006

RC

340878

1651331

931

315

-50

3/4/2022

3/5/2022

180

Aburna

ABR007

RC

340826

1651328

941

315

-50

3/6/2022

3/6/2022

90

Aburna

ABR008

RC

341631

1650633

930

315

-50

3/7/2022

3/8/2022

102

Aburna

ABR009

RC

341546

1650555

948

315

-50

3/8/2022

3/8/2022

72

Aburna

ABR010

RC

341504

1650476

958

315

-50

3/9/2022

3/9/2022

78

Aburna

ABR011

RC

341388

1650261

950

315

-50

3/9/2022

3/10/2022

84

Aburna

ABR012

RC

341221

1650082

944

315

-50

3/10/2022

3/10/2022

78

Aburna

ABR013

RC

340406

1649981

981

315

-50

3/11/2022

3/11/2022

60

Aburna

ABR014

RC

340406

1649981

981

315

-70

3/11/2022

3/12/2022

84

Aburna

ABR015

RC

341571

1651533

936

315

-50

3/14/2022

3/14/2022

114

Aburna

ABR016

RC

340850

1651234

950

315

-50

3/15/2022

3/16/2022

186

Aburna

ABR017

RC

340823

1651264

945

315

-50

3/16/2000

3/17/2022

100

Aburna

ABR018

RC

340906

1651240

965

315

-50

3/18/2022

3/18/2022

70

Aburna

ABR019

RC

341756

1651866

943

315

-50

3/18/2022

3/18/2022

60

Total

2000

 

About Alpha

Alpha is an exploration company listed on the TSX-V exchange under the symbol ALEX that has made 3 important discoveries in 2 years at it's Kerkasha Project in Eritrea:

  • Anagulu porphyry gold-copper

  • Tolegimja volcanogenic-massive-sulphide (VMS)

  • Aburna orogenic gold

The company is managed by a group of highly experienced and successful professionals with many years of experience carrying out exploration and resource development programs in Eritrea and Sudan and is focused on the discovery of world class economic gold and base metals deposits in the highly prospective Arabian-Nubian shield, on either side of the Red Sea. Alpha currently holds a 100% interest in the large (771 km2) Kerkasha Exploration License in southwest Eritrea, located 135 km west-southwest of the capital city of Asmara. Since acquiring the property in January 2018, the company has spent approximately CAD$13 million on exploration and identified 17 in prospects of which six have been drilled to date.

For further information go to the Alpha webpage at www.alpha-exploration.com or contact:

Michael Hopley
President and Chief Executive Officer
Alpha Exploration Ltd.
Email: mhopley@alpha-exploration.com
Tel: +44 207129 1148

Qualified Person

All scientific and technical information in this press release, including the results of the Aburna drill program and how these results relate to the ongoing exploration at the Kerkasha Project has been reviewed, verified, and approved by Michael Hopley, President, Chief Executive Officer of Alpha and a "qualified person" for the purposes of national Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Cautionary Notes

This press release is intended for distribution in Canada only and is not intended for distribution to United States newswire services or dissemination in the United States.

Forward‐Looking Statements

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to: future dataset interpretations, sampling, plans for its projects (including the Anagulu prospect), surveys related to Alpha's assets, and the Company's drilling program. Often, but not always, forward-looking statements or information can be identified by the use of words such as "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. With respect to forward-looking statements and information contained herein, Alpha has made numerous assumptions including among other things, assumptions about general business and economic conditions and the price of gold and other minerals. The foregoing list of assumptions is not exhaustive.

Although management of Alpha believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that forward-looking statements or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to: risks relating to Alpha's financing efforts; risks associated with the business of Alpha given its limited operating history; business and economic conditions in the mining industry generally; the supply and demand for labour and other project inputs; changes in commodity prices; changes in interest and currency exchange rates; risks relating to inaccurate geological and engineering assumptions (including with respect to the tonnage, grade and recoverability of reserves and resources); risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters); risks relating to adverse weather conditions; political risk and social unrest; changes in general economic conditions or conditions in the financial markets; changes in laws (including regulations respecting mining concessions); risks related to the direct and indirect impact of COVID-19 including, but not limited to, its impact on general economic conditions, the ability to obtain financing as required, and causing potential delays to exploration activities; those factors discussed under the heading "Risk Factors" in the Final Prospectus; and other risk factors as detailed from time to time. Alpha does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/129135