Canada Markets close in 3 hrs 6 mins

Timberline Resources Corporation (TBR.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.1250+0.0050 (+4.17%)
As of 12:34PM EDT. Market open.
Full screen
Previous Close0.1200
Open0.1200
Bid0.1200 x 0
Ask0.1250 x 0
Day's Range0.1200 - 0.1250
52 Week Range0.1100 - 0.3700
Volume234,000
Avg. Volume59,145
Market Cap19.959M
Beta (5Y Monthly)1.84
PE Ratio (TTM)N/A
EPS (TTM)-0.0580
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • ACCESSWIRE

    Timberline Announces 2023 Work Program at Eureka Project: Exploration, Resource Development and Permitting Support

    Timberline Resources Corporation (OTCQB:TLRS)(TSXV:TBR) ("Timberline" or the "Company") is pleased to announce its 2023 plans for exploration, engineering, and baseline environmental work at its 100%-controlled Eureka Project in Nevada (Figure 1).

  • ACCESSWIRE

    Timberline Confirms New Gold-Silver Target at Eureka Project

    Timberline Resources Corporation (OTCQB:TLRS)(TSX-V:TBR) ("Timberline" or the "Company") is pleased to announce that it has identified a new high-grade gold and silver target in the New York Canyon claim block of its 100%-controlled Eureka Project in Nevada (Figure 1). Recent mapping and sampling in the historical mining area have identified a new drill target with outcropping high-grade gold and silver mineralization.

  • ACCESSWIRE

    Timberline Reports Final Results from 2022 Drilling at the Eureka Project, Nevada

    Timberline Resources Corporation (OTCQB:TLRS)(TSX-V:TBR) ("Timberline" or the "Company") reports the final drill results from the 2022 drilling program at its 100%-controlled Eureka Project in Nevada. Eight drill holes are reported here, including four from the Water Well Zone (WWZ), three from the Oswego target, and one large step out into the South Pediment area (Figure 1).