Canada Markets closed

Altiplano Metals Inc. (APN.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.2000-0.0200 (-9.09%)
At close: 03:26PM EDT
Full screen
Previous Close0.2200
Open0.2050
Bid0.2000 x 0
Ask0.2200 x 0
Day's Range0.2000 - 0.2050
52 Week Range0.1750 - 0.4200
Volume41,890
Avg. Volume43,890
Market Cap22.691M
Beta (5Y Monthly)1.95
PE Ratio (TTM)N/A
EPS (TTM)-0.0200
Earnings DateNov 15, 2021
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • Newsfile

    Altiplano Receives Final Processing Permit and Begins Operations at El Penon

    Edmonton, Alberta--(Newsfile Corp. - June 23, 2022) - Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report that final processing approval has been received from the Chilean Mining authority SERNAGEOMIN (Servicio Nacional de Geología y Minería). This final permit allows operations to begin at the Company's processing facility constructed at El Peñón, approximately 15 kms from the Farellon Copper Gold mine located near La Serena, Chile.Processing of s

  • Newsfile

    Altiplano Reports May 2022 Results at Farellon with Record Monthly Income

    Edmonton, Alberta--(Newsfile Corp. - June 16, 2022) - Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on the May 2022 operating results from the Farellon Copper-Gold (Cu-Au) mine located near La Serena, Chile.During the month of May, approximately 3,432 tonnes of mineralized copper-gold material was produced at Farellon and approximately 2,750 tonnes were shipped and processed. A slight improvement is noted in the amount produced in May ...

  • Newsfile

    Altiplano Reports April 2022 Results at Farellon with 2.07% Copper Recovery

    Edmonton, Alberta--(Newsfile Corp. - May 26, 2022) - Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on the April 2022 operating results from the Farellon Copper-Gold (Cu-Au) mine located near La Serena, Chile. During the month of April, approximately 3,420 tonnes of mineralized copper-gold material was produced at Farellon and approximately 2,240 tonnes were shipped and processed. Production improved by 34% over the March output of 2,543 ...