Canada Markets closed

TomaGold Corporation (TOGOF)

Other OTC - Other OTC Delayed Price. Currency in USD
Add to watchlist
0.0535+0.0011 (+2.12%)
At close: 3:22PM EDT
Full screen
Trade prices are not sourced from all markets
Previous Close0.0524
Open0.0600
Bid0.0000 x 0
Ask0.0000 x 0
Day's Range0.0535 - 0.0600
52 Week Range0.0407 - 0.0870
Volume43,341
Avg. Volume13,674
Market Cap8.145M
Beta (5Y Monthly)-0.61
PE Ratio (TTM)2.82
EPS (TTM)0.0190
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • GlobeNewswire

    TomaGold expands Obalski drilling program to 11,500 metres

    MONTREAL, Sept. 20, 2021 (GLOBE NEWSWIRE) -- TOMAGOLD CORPORATION (TSXV: LOT) (OTCQB: TOGOF) (“TomaGold” or the “Corporation”) is pleased to provide an update on the drilling program on its wholly-owned Obalski property, located 3 km south of Chibougamau. The program, which started on July 10, 2021, has been expanded from 10,000 metres to 11,500 metres of drilling following reassessment of the drill targets. Drilling has been temporarily paused and will resume in October. As at September 6, 2021

  • GlobeNewswire

    TomaGold now trading on OTCQB Venture Market

    MONTREAL, Sept. 15, 2021 (GLOBE NEWSWIRE) -- TOMAGOLD CORPORATION (TSXV: LOT) (OTCQB: TOGOF) (“TomaGold” or the “Corporation”) is pleased announce that it has qualified to trade on the OTCQB® Venture Market. TomaGold upgraded to OTCQB® Venture Market from the Pink® market and began trading today on the OTCQB under the symbol TOGOF and will remain listed on the TSX Venture Exchange under the symbol LOT. “Trading on the OTCQB will enhance our visibility and make the Corporation accessible to a muc

  • GlobeNewswire

    TomaGold begins its 10,000-metre drilling program on Obalski

    MONTREAL, July 06, 2021 (GLOBE NEWSWIRE) -- TOMAGOLD CORPORATION (TSXV: LOT) (“TomaGold” or the “Corporation”) is pleased to announce the start of its 10,000-metre drilling program on its wholly-owned Obalski property, located 3 km south of Chibougamau. “This new drilling program is aimed at defining the A-Po zone by drilling every 50 metres between sections 120 E and 450 E to a vertical depth of at least 500 metres, with some holes reaching a vertical depth of 650 metres. To optimize our chance