Canada markets close in 16 minutes

TMC the metals company Inc. (TMC)

NasdaqGS - NasdaqGS Real Time Price. Currency in USD
Add to watchlist
0.9800-0.0300 (-2.97%)
As of 03:44PM EDT. Market open.
Full screen
Trade prices are not sourced from all markets
Previous Close1.0100
Open1.0000
Bid0.9702 x 1200
Ask0.9878 x 1800
Day's Range0.9580 - 1.0000
52 Week Range0.9580 - 15.3900
Volume936,343
Avg. Volume1,519,905
Market Cap222.615M
Beta (5Y Monthly)1.44
PE Ratio (TTM)N/A
EPS (TTM)-0.5000
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target Est3.00
  • GlobeNewswire

    The Metals Company Announces Key Event Schedule for June 2022

    NEW YORK, June 16, 2022 (GLOBE NEWSWIRE) -- Following successful deep-water trials of the polymetallic nodule collector vehicle and riser system, as well as the release of its inaugural Impact Report, The Metals Company (Nasdaq: TMC) (“TMC” or “the Company”), an explorer of lower-impact battery metals from seafloor polymetallic nodules, intends to participate at the following virtual and in-person conferences being held by leading organizations in June 2022: Conferences Benchmark Mineral Intelli

  • GlobeNewswire

    The Metals Company Publishes Inaugural Impact Report Detailing Future Operations and Strategy for Net-Positive Planetary Impact

    TMC’s first Impact Report outlines the Company’s mission to create a carefully managed metal commons by unlocking the planet’s largest undeveloped source of high-grade battery metals amid surging demand for these materials as the world seeks to address the climate crisisIn the context of an accelerated transition to renewable energy and electric transport, TMC outlines the anticipated impacts and mitigation measures for its plans to collect polymetallic nodules from the Clarion Clipperton Zone (

  • GlobeNewswire

    The Metals Company and Allseas Announce Successful Deepwater Commissioning of Riser Pipe and Jumper Hose Designed to Lift Polymetallic Nodules from Seafloor to Surface

    Flexible Jumper Hose Engineers prepare to deploy the flexible jumper hose over the side of the Hidden Gem, before connecting it to the base of the riser. Riser Pipe Assembly Engineers inspect a section of the riser pipe aboard the Hidden Gem. Riser Pipe Sections Individual sections of the riser pipe await assembly aboard the Hidden Gem. Riser Deployment Allseas used the derrick onboard the former drillship for at-sea construction of the pilot riser system which will ultimately extend to 4km deep