Canada markets closed

TAG Oil Ltd. (TAO.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.6200-0.0100 (-1.59%)
At close: 03:59PM EDT
Full screen
Previous Close0.6300
Open0.6200
Bid0.6000 x N/A
Ask0.6300 x N/A
Day's Range0.6100 - 0.6300
52 Week Range0.3400 - 0.7500
Volume105,815
Avg. Volume159,377
Market Cap114.773M
Beta (5Y Monthly)0.13
PE Ratio (TTM)N/A
EPS (TTM)N/A
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateApr 15, 2020
1y Target EstN/A
  • CNW Group

    TAG Oil Reports Results for Financial Year End

    TAG Oil Ltd. (TSXV: TAO) (OTCQX: TAOIF) and (FSE: TOP) ("TAG Oil" or the "Company") is pleased to report the filing of its financial results for the fiscal year ending December 31, 2023. A copy of TAG Oil's financial statements, management discussion and analysis, and annual information form for its most recently completed financial year are available on SEDAR+ (www.sedarplus.ca) and on the Company's website (http://www.tagoil.com/).

  • PR Newswire

    TAG Oil Commences Flow Back of BED4-T100 Horizontal Well

    TAG Oil Ltd. (TSXV: TAO) (OTCQX: TAOIF) (FSE: TOP) ("TAG Oil" or the "Company") is pleased to announce that it has successfully pumped all twelve planned stages of its multistage hydraulic frac on its BED4-T100 ("T100") well location. Stages one through three, which are located across the heavily fractured and more permeable section of the well, received a concentrated acid stimulation while stages four through twelve were mechanically fracture stimulated with proppant. At least 50 tonnes of san

  • CNW Group

    TAG Oil to Commence Hydraulic Fracture Stimulation of BED4-T100 Horizontal Well

    TAG Oil Ltd. (TSXV: TAO) (OTCQX: TAOIF) ("TAG Oil" or the "Company") is pleased to announce that completion and multistage hydraulic fracture equipment, personnel, camp and natural frac sand have been mobilized to the BED4-T100 ("T100") well location. Additionally, static reservoir pressure and temperature measurements were performed to optimize the simulation model and completion design of the T100 well.