Highlights:Q2 Metals to acquire 100% interest in the Cisco Lithium Property, consisting of 222 claims totaling 11,374-ha.Highly prospective with the potential for multiple large-scale lithium discoveries.Limited historical exploration with only six drill holes completed, the majority of which undercut mineralization.Two historical drill holes returned:115.4 m at 1.21% Li2O cumulative width of five separate pegmatite intervals in hole CS-23-05.57.8 m at 1.27% Li2O cumulative width of three separa
Highlights:A total of 20 holes, for approximately 3,085 metres was completed during the Winter Drill Program.Drill holes MIA24-033 and 036, located in the centre of the mineralized zone, highlight the potential with aggregate lengths of spodumene-mineralized core intervals of 19.0 and 23.7 metres, respectively.Core assay results remain to be reported for 31 drill holes from the Company's inaugural drill program in the fall of 2023.Vancouver, British Columbia--(Newsfile Corp. - February 27, 2024)
Highlights:The 2024 winter drill campaign at the Mia Lithium Property is targeting 4,000 m with potential to expand the campaign.Two (2) drill rigs will be utilized for the Winter Drill Program. Core assay results remain to be reported for 31 drill holes from the Company's inaugural drill program in the fall of 2023.Vancouver, British Columbia--(Newsfile Corp. - January 22, 2024) - Q2 Metals Corp. (TSXV: QTWO) (OTCQB: QUEXF) (FSE: 458) ("Q2" or the "Company") ...