Canada markets closed

Osisko Metals Incorporated (OM.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.4450-0.0200 (-4.30%)
At close: 3:14PM EST
Full screen
Previous Close0.4650
Open0.4550
Bid0.4400 x N/A
Ask0.4500 x N/A
Day's Range0.4250 - 0.4600
52 Week Range0.2400 - 0.5300
Volume246,419
Avg. Volume118,900
Market Cap79.566M
Beta (5Y Monthly)1.48
PE Ratio (TTM)N/A
EPS (TTM)N/A
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
All
News
Press Releases
  • GlobeNewswire

    Osisko Metals Grants Stock Options

    MONTREAL, Jan. 18, 2021 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX-V: OM; OTCQX: OMZNF; FRANKFURT: 0B51) announces today that its Board of Directors approved the grant of incentive stock options to directors, officers, key employees and key consultants to purchase up to an aggregate of 2,250,000 common shares in the capital stock of the Company. Grants are subject to a three-year vesting period and a five-year term at an exercise price of $0.44 per share. About Osisko Metals Osisko Metals Incorporated is a Canadian exploration and development company creating value in the base metal space. The Company controls two of Canada’s premier past-producing zinc mining camps: 1) the Pine Point Project that is located in the Northwest Territories, for which the recently filed PEA has indicated an after-tax NPV of $500M and an IRR of 29.6%. The Pine Point Project PEA is based on current Mineral Resource Estimates that are amenable to open pit and shallow underground mining and consist of 12.9Mt grading 6.29% ZnEq of Indicated Mineral Resources and 37.6Mt grading 6.80% ZnEq of Inferred Mineral Resources. Please refer to the technical report entitled “Preliminary Economic Assessment, Pine Point Project, Hay River, North West Territories, Canada” dated July 30, which has been filed on SEDAR. The Pine Point Project is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure, paved highway access, and has 100 kilometres of viable haulage roads already in place; 2) The Bathurst Mining Camp projects are located in northern New Brunswick. The company has optioned the majority of its holding in the Bathurst Camp to Brunswick Exploration, pending TSXV approval for the transaction. The current Mineral Resources mentioned in this press release conform to NI43-101 standards and were prepared by independent qualified persons, as defined by NI43-101 guidelines. The abovementioned Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. The quantity and grade of the reported Inferred Mineral Resources are conceptual in nature and are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological grade and/or quality of continuity. Zinc equivalency percentages are calculated using metal prices, forecasted metal recoveries, concentrate grades, transport costs, smelter payable metals and charges (see respective technical reports for details). For further information on Osisko Metals, visit www.osiskometals.com or contact: Robert WaresCEOOsisko Metals IncorporatedEmail: info@osiskometals.comwww.osiskometals.com

  • Osisko Metals Outlines 2021 Objectives for Pine Point
    GlobeNewswire

    Osisko Metals Outlines 2021 Objectives for Pine Point

    MONTREAL, Jan. 11, 2021 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the "Company" or "Osisko Metals") (TSX-V: OM; OTCQX: OMZNF; FRANKFURT: 0B51) is pleased to announce its 2021 exploration and development plans for Pine Point with a focus towards continuing to de-risk the project and bringing further improvements to the 2020 Preliminary Economic Assessment (“PEA”). * Drilling will begin on January 14th. Osisko Metals is planning a 3,000 meters winter campaign focused on infill and extension drilling in the Western Zone with the objective of converting the bulk of three high-priority prismatic deposits to the Indicated Resource category. * Hydrogeological studies and tests planned across the property to further refine the dewatering model used in the 2020 PEA. Osisko Metals believes that improvements to the hydrogeological model could lead to substantial water management cost reductions over life of mine, including initial CAPEX, in future economic studies. * Updated PEA and MRE in early 2022. With the potential for operational improvements and the incorporation of extension and infill drilling completed in 2020 and 2021, Osisko Metals will update the Pine Point PEA to better reflect sustained positive zinc and lead commodity prices. * Submit EA Initiation Package to advance permitting in accordance with the project development timeline. The Environmental Assessment (“EA”) Initiation Package, including the project Description as per the PEA, is expected to be submitted in February 2021. On receipt of a positive decision on the EA, expected in Q3 2023, the project permitting phase will then commence and is expected to be completed by Q3 2024.Robert Wares, Chairman and CEO, commented: “2020 was an important year for Osisko Metals and Pine Point with the release of the 2020 PEA, cementing Pine Point as a Tier 1 zinc development project. Pine Point combines excellent open pit metal grades with available infrastructure and projected low operating costs, pointing to the potential for a “Top 10” global zinc producer. Building on this success, we will focus on delivering increased value to Pine Point through our planned 2021 drill campaign and hydrogeological studies.”2020 Highlights * 2020 PEA: After-tax NPV and IRR of $500M and 28.6% using conservative, long-term metal prices and smelting assumptions. With a CAPEX of $550M, Pine Point would produce, on average, over 350Mlbs of zinc during its first 6 years of operation. This would make Pine Point the eight largest zinc mine in the world. The proposed mine would have a ten-year life. However, with over a dozen individual deposit still open along strike, there is substantial potential to increase the mine life beyond the initial ten years. * Expansion drilling the East Mill and Central Zone: in support of the opportunities identified in the PEA for resource and mine life expansion, Osisko Metals reported excellent results from its limited 2020 drill campaign in the O53 deposit area. Highlights include:∘  Drill hole O53-20-PP-012 intersected 28.80 metres grading 23.90% Zn and 6.24% Pb. The hole extends the high-grade O53 prismatic mineralization approximately 10 metres below the currently modelled pit boundary in the immediate area of the hole. ∘  Drill hole OM13-20-001 intersected 4.80 metres grading 7.25% Zn and 1.45% Pb. This hole intersected well-developed, near surface Tabular style mineralization that potentially extends mineralization 800 metres west of the current western limit of the O53 deposit. ∘  Drill hole O53-20-PP-003 intersected 3.00 metres grading 8.45% Zn and 0.61% Pb and also indicates the presence of tabular mineralization 135 metres to the west of the O53 deposit, well outside the boundaries of the current pit-constrained resource model, indicating potential for a new tabular deposit extending westward at shallow depthsAbout Osisko MetalsOsisko Metals Incorporated is a Canadian exploration and development company creating value in the base metal space. The Company controls two of Canada’s premier past-producing zinc mining camps: 1) the Pine Point Project that is located in the Northwest Territories, for which the recently filed PEA has indicated an after-tax NPV of $500M and an IRR of 29.6%. The Pine Point Project PEA is based on current Mineral Resource Estimates that are amenable to open pit and shallow underground mining and consist of 12.9Mt grading 6.29% ZnEq of Indicated Mineral Resources and 37.6Mt grading 6.80% ZnEq of Inferred Mineral Resources. Please refer to the technical report entitled “Preliminary Economic Assessment, Pine Point Project, Hay River, North West Territories, Canada” dated July 30, which has been filed on SEDAR. The Pine Point Project is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure, paved highway access, and has 100 kilometres of viable haulage roads already in place; 2) The Bathurst Mining Camp projects are located in northern New Brunswick. The company has optioned the majority of its holding in the Bathurst Camp to Brunswick Exploration, pending TSXV approval for the transaction.The current Mineral Resources mentioned in this press release conform to NI43-101 standards and were prepared by independent qualified persons, as defined by NI43-101 guidelines. The abovementioned Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. The quantity and grade of the reported Inferred Mineral Resources are conceptual in nature and are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological grade and/or quality of continuity. Zinc equivalency percentages are calculated using metal prices, forecasted metal recoveries, concentrate grades, transport costs, smelter payable metals and charges (see respective technical reports for details).For further information on this press release, visit www.osiskometals.com or contact:Robert Wares, CEO Osisko Metals Incorporated Email: info@osiskometals.com www.osiskometals.com  Cautionary Statement on Forward-Looking InformationThis news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as “expects”, or “does not expect”, “is expected”, “interpreted”, management’s view”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “potential”, “feasibility”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken, occur or be achieved) are not statements of historical fact and constitute forward-looking information. This news release contains forward-looking information pertaining to, among other things,  having the potential to be one of the top ten zinc mines globally; the results of the PEA, including, but not limited to, the IRR, NPV and estimated costs, production, production rate and mine life; the expectation that the Pine Point Project will be an robust operation and profitable at a variety of prices and assumptions; the expected high quality of the Pine Point concentrates; the potential impact of the Pine Point Project in the Northwest Territories, including but not limited to the potential generation of tax revenue and contribution of jobs; and the Pine Point Project having the potential for mineral resource expansion and new discoveries. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management, in light of management’s experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, including, without limitation, assumptions about: favourable equity and debt capital markets; the ability to raise any necessary additional capital on reasonable terms to advance the development of its projects and pursue planned exploration; future prices of zinc and lead; the timing and results of exploration and drilling programs; the accuracy of mineral resource estimates; production costs; operating conditions being favourable; political and regulatory stability; the receipt of governmental and third party approvals; licences and permits being received on favourable terms; sustained labour stability; stability in financial and capital markets; availability of equipment; and positive relations with local groups.  Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; Osisko Metals’ history of losses and negative cash flow; uncertainties relating to the availability and costs of financing needed in the future; fluctuations in commodity prices; the ability of Osisko Metals to complete further exploration activities, including drilling; delays in the development of projects; environmental risks; community and non-governmental actions; the ability of Osisko Metals to retain its key management employees and skilled and experienced personnel; and those risks set out in the Company’s public documents filed at www.sedar.com. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

  • Osisko Metals Announces Closing of $6.5 Million Royalty Financing on Pine Point Project and $2 Million Non-Brokered Private Placement of Units
    GlobeNewswire

    Osisko Metals Announces Closing of $6.5 Million Royalty Financing on Pine Point Project and $2 Million Non-Brokered Private Placement of Units

    NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES MONTREAL, Dec. 30, 2020 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the "Corporation" or "Osisko Metals") (TSXV: OM; OTCQX: OMZNF; FRANKFURT: 0B51) is pleased to announce that it has closed its previously-announced royalty financing pursuant to which Osisko Gold Royalties Ltd ("Osisko Royalties") was granted a further 0.5% net smelter returns royalty ("NSR royalty") on the Pine Point Project for cash consideration of $6.5 million (the "NSR Amendment"). After giving effect to the NSR Amendment, Osisko Royalties now holds a combined 2% NSR royalty on the Pine Point Project (which is not subject to buy-back rights in favor of Osisko Metals).The Corporation is also pleased to announce that it has closed its previously-announced non-brokered private placement, pursuant to which the Corporation sold an aggregate of 4,130,250 units of the Corporation (each, a "Unit") at a price of $0.48 per Unit for aggregate gross proceeds of $1,982,520 (the "Offering"). Each Unit consists of one common share of the Corporation (each, a "Common Share") and one-half-of-one common share purchase warrant of the Corporation (each whole warrant, a "Warrant"). Each Warrant entitles the holder thereof to acquire one Common Share at a price of $0.58 per share for a 24-month period following the closing date of the Offering.The net proceeds from the Offering will be used for the development of Osisko Metals' Pine Point Project, specifically drilling and hydrogeological studies, as well as general corporate purposes.The following "insiders" of the Corporation have subscribed for Units under the Offering:InsiderCategoryNumber of UnitsSubscription Amount Robert Wares10% Security Holder; CEO and Chairman1,250,000$600,000 Osisko Mining Inc. also subscribed for 1,250,000 Units as part of the Offering, representing a subscription amount of $600,000.Each subscription by an "insider" is considered to be a "related party transaction" for purposes of Multilateral Instrument 61-101 – Protection of Minority Security Holders in Special Transactions ("MI 61-101") and Policy 5.9 – Protection of Minority Security Holders in Special Transactions of the TSX Venture Exchange. The Corporation is relying on exemptions from the formal valuation and minority shareholder approval requirements available under MI 61-101. The Corporation is exempt from the formal valuation requirement in section 5.4 of MI 61-101 in reliance on sections 5.5(a) and (b) of MI 61-101 as the fair market value of the transaction, insofar as it involves interested parties, is not more than the 25% of the Corporation's market capitalization, and no securities of the Corporation are listed or quoted for trading on prescribed stock exchanges or stock markets. Additionally, the Corporation is exempt from minority shareholder approval requirement in section 5.6 of MI 61-101 in reliance on section 5.7(b) as the fair market value of the transaction, insofar as it involves interested parties, is not more than the 25% of the Corporation's market capitalization.All securities issued under the Offering are subject to a four month hold period which will expire May 1, 2021. The Offering is subject to final acceptance of the TSX Venture Exchange. The securities offered have not been registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from the registration requirements. This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any State in which such offer, solicitation or sale would be unlawful.About Osisko MetalsOsisko Metals Incorporated is a Canadian exploration and development company creating value in the base metal space with a focus on zinc mineral assets. The Corporation controls two of Canada's premier past-producing zinc mining camps: 1) the Pine Point Project that is located in the Northwest Territories, for which the recently filed preliminary economic assessment ("PEA") has indicated an after-tax NPV of $500 million and an IRR of 29.6%. The Pine Point Project PEA is based on current mineral resource estimates that are amenable to open pit and shallow underground mining and consist of 12.9Mt grading 6.29% ZnEq of indicated mineral resources and 37.6Mt grading 6.80% ZnEq of inferred mineral resources. For the assumptions, qualifications and limitations in the Pine Point Project PEA, please refer to the technical report entitled "Preliminary Economic Assessment, Pine Point Project, Hay River, North West Territories, Canada" dated July 30, 2020 (with an effective date of June 11, 2020), which has been filed on SEDAR (www.sedar.com) under Osisko Metals' issuer profile. The Pine Point Project is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure, paved highway access, and has 100 kilometres of viable haulage roads already in place; 2) The Bathurst Mining Camp projects are located in northern New Brunswick. The Corporation has optioned the majority of its holding in the Bathurst Camp to Brunswick Exploration.The mineral resource estimates described in this news release have been prepared in accordance with National Instrument 43-101– Standards of Disclosure for Mineral Projects by independent qualified persons (each as defined by National Instrument 43-101– Standards of Disclosure for Mineral Projects). The abovementioned mineral resources are not mineral reserves and do not have demonstrated economic viability. The quantity and grade of the reported inferred mineral resources are conceptual in nature and are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological grade and/or quality of continuity. Zinc equivalency percentages are calculated using metal prices, forecasted metal recoveries, concentrate grades, transport costs, smelter payable metals and charges (see respective technical reports for details).For further information on this news release, visit www.osiskometals.com or contact:Robert Wares Chairman and CEO Email: info@osiskometals.com www.osiskometals.comCautionary Note Regarding Forward-Looking InformationThis news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. The information in this news release about the closing of the Offering; the use of proceeds of the Offering; the approval of the TSX Venture Exchange relating to the Offering; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward- looking information. This forward-looking information is based on reasonable assumptions and estimates of management of the Corporation at the time such assumptions and estimates were made, and involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Osisko Metals to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Corporation's public documents filed on SEDAR (www.sedar.com) under Osisko Metals' issuer profile. Although the Corporation believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.