Canada Markets closed

Metallica Metals Corp. (MM.CN)

Canadian Sec - Canadian Sec Real Time Price. Currency in CAD
Add to watchlist
0.1550-0.0400 (-20.51%)
At close: 3:55PM EST
Full screen
Previous Close0.1950
Open0.1600
Bid0.1550 x N/A
Ask0.1700 x N/A
Day's Range0.1550 - 0.1600
52 Week Range0.1100 - 0.5700
Volume171,829
Avg. Volume101,959
Market Cap7.738M
Beta (5Y Monthly)2.95
PE Ratio (TTM)N/A
EPS (TTM)-0.0780
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • GlobeNewswire

    REPEAT -- Metallica Metals Intersects High Grade Gold Mineralization in First Drill Holes Completed on Starr Gold-Silver Project

    Figure 1 Location of Metallic Metals’ Starr gold-silver project with respect to adjacent properties including the Moss Lake gold deposit (sources: 2013 NI 43-101 Technical Report and PEA for the Moss Lake Project and Kesselrun Resources October 7, 2020 news release) Figure 2 Drilling completed in the Central portion of the Starr Property (STR21-001 to 003); *Assays pending for holes STR21-004 to 006. **Cross section indicated by line A-A’ Figure 3 Cross section (A-A’) of drilling completed to da

  • GlobeNewswire

    Metallica Metals Intersects High Grade Gold Mineralization in First Drill Holes Completed on Starr Gold-Silver Project

    Figure 1 Location of Metallic Metals’ Starr gold-silver project with respect to adjacent properties including the Moss Lake gold deposit (sources: 2013 NI 43-101 Technical Report and PEA for the Moss Lake Project and Kesselrun Resources October 7, 2020 news release) Figure 2 Drilling completed in the Central portion of the Starr Property (STR21-001 to 003); *Assays pending for holes STR21-004 to 006. **Cross section indicated by line A-A’ Figure 3 Cross section (A-A’) of drilling completed to da

  • GlobeNewswire

    REPEAT – Metallica Metals Commences 4,000 Metre Drilling Program On Its Starr Gold-Silver Project, Thunder Bay Mining District

    Figure 1: Location of Metallic Metals’ Starr gold-silver project with respect to adjacent properties including the Moss Lake gold deposit (sources: 2013 NI 43-101 Technical Report and PEA for the Moss Lake Project and Kesselrun Resources October 7, 2020 news release) Figure 2: Planned drilling (red) in the Central portion of the Starr Property with known showings and gold values from grab and soil sampling, underlain by TMI (Total Magnetic Intensity from the First Vertical Derivative) Figure 3: