Previous Close | 0.6500 |
Open | 0.6500 |
Bid | 0.7300 x N/A |
Ask | 0.7400 x N/A |
Day's Range | 0.6500 - 0.7600 |
52 Week Range | 0.6200 - 3.0500 |
Volume | |
Avg. Volume | 359,672 |
Market Cap | 102.258M |
Beta (5Y Monthly) | N/A |
PE Ratio (TTM) | N/A |
EPS (TTM) | -0.4600 |
Earnings Date | N/A |
Forward Dividend & Yield | N/A (N/A) |
Ex-Dividend Date | N/A |
1y Target Est | 4.70 |
Excellent follow-up drill results from high-grade discovery holes at the “Noé” target announced in February 2024, including: 1.53% Li2O over 15m, incl. 2.31% Li2O over 8m1.15% Li2O over 19m, incl. 1.67% Li2O over 10m1.32% Li2O over 14m, incl. 2.16% Li2O over 7m The Noé target, located ~1.5km north of the mineral resource area, was not included in the NI 43-101 estimate announced on April 4, 2024Salinas currently hosts a 14.76Mt lithium deposit, or 25% of the Company’s total global mineral resour
Global Mineral Resources increase 26% to 60.1Mt: M&I: 32.51Mt grading 1.31% Li2OInferred: 27.57Mt grading 1.24% Li2O Updated Bandeira Mineral Resources of 41.9 Mt grading 1.35% Li2O M&I: 23.68Mt grading 1.34% Li2OInferred 18.25Mt grading 1.37% Li2O TORONTO, April 12, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) (“Lithium Ionic” or the “Company”), is pleased to report an updated NI 43-101 compliant mineral resource estimate (“MRE”) for the Bandeira Lithium Proj
Salinas MRE increases global resources by 45% to 47.8Mt M&I: 5.86Mt @ 1.09% Li2OInferred 8.9Mt @ 0.97% Li2O~65% of the MRE is considered open pit PEA for Salinas initiated; completion expected in H2 2024Bandeira Operational Update Feasibility Study to be released in May 2024Construction permits remain on track to be granted in early Q3 2024 TORONTO, April 04, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) (“Lithium Ionic” or the “Company”), is pleased to announc