Canada markets open in 1 hour 51 minutes

Giyani Metals Corp. (KT9.F)

Frankfurt - Frankfurt Delayed Price. Currency in EUR
Add to watchlist
0.04650.0000 (0.00%)
As of 08:04AM CEST. Market open.
Full screen
Loading interactive chart...
  • GlobeNewswire

    Giyani Completes First Drawdown on its US$16 Million IDC Facility

    TORONTO, April 24, 2024 (GLOBE NEWSWIRE) -- Giyani Metals Corp. (TSXV:EMM, GR:A2DUU8) (“Giyani” or the “Company”), developer of the K.Hill battery-grade manganese project in Botswana (“K.Hill” or “the Project”), is pleased to announce the receipt of US$5.7 million (ZAR109 million) in first drawdown funds from the Industrial Development Corporation of South Africa (“IDC”) as part of the US$16m South African Rand (“ZAR”) equivalent convertible loan facilities (“IDC Facility”). Highlights: Giyani h

  • GlobeNewswire

    2024 Drilling Programme Commences at the K.Hill Project

    TORONTO, April 09, 2024 (GLOBE NEWSWIRE) -- Giyani Metals Corp. (TSXV:EMM, GR:A2DUU8) ("Giyani" or the "Company") developer of the K.Hill battery-grade manganese project in Botswana ("K.Hill" or the "Project") is pleased to announce that as part of its planned 2025 Definitive Feasibility Study (“DFS”), Giyani has commenced an infill drilling programme at the Project. The information gathered from this programme is expected to provide the basis for an updated Mineral Resource Estimate (“MRE”) to

  • GlobeNewswire

    Giyani Satisfies Key Condition for Drawdown Under US$16 Million IDC Facility

    TORONTO, March 28, 2024 (GLOBE NEWSWIRE) -- Giyani Metals Corp. (TSXV:EMM, GR:A2DUU8) ("Giyani" or the "Company"), developer of the K.Hill battery-grade manganese project in Botswana ("K.Hill"), is pleased to announce that the TSX Venture Exchange ("TSXV") has conditionally approved the US$16 million facility secured with the Industrial Development Corporation of South Africa Limited ("IDC"). Following agreement with IDC, the facility documents have been amended to align with the TSXV requiremen