Canada markets closed

Imperial Metals Corporation (III.TO)

Toronto - Toronto Real Time Price. Currency in CAD
Add to watchlist
3.4800+0.0400 (+1.16%)
At close: 3:02PM EST
Full screen
Previous Close3.4400
Open3.4600
Bid3.4700 x 0
Ask3.5100 x 0
Day's Range3.4000 - 3.4800
52 Week Range3.3600 - 6.2500
Volume2,707
Avg. Volume25,901
Market Cap492.044M
Beta (5Y Monthly)1.35
PE Ratio (TTM)N/A
EPS (TTM)N/A
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateAug. 30, 2000
1y Target EstN/A
All
News
  • GlobeNewswire

    Imperial Reports Third Quarter 2021 Financial Results

    VANCOUVER, British Columbia, Nov. 09, 2021 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (the “Company”) (TSX:III) reports financial results for the three and nine months ended September 30, 2021, as summarized in this release and discussed in detail in the Management’s Discussion & Analysis. The Company’s financial results are prepared in accordance with International Financial Reporting Standards (“IFRS”). The reporting currency of the Company is the Canadian (“CDN”) Dollar. QUARTER HIGHLIGH

  • GlobeNewswire

    Imperial Reports Red Chris Update

    VANCOUVER, British Columbia, Oct. 27, 2021 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (the “Company”) (TSX:III) reports Red Chris metal production (100%) for the third quarter of 2021 was 17.2 million pounds copper and 15,249 ounces gold, compared to 17.6 million pounds copper and 15,451 ounces gold produced during the second quarter of 2021. Imperial’s 30% portion of the third quarter production was 5.2 million pounds copper and 4,575 ounces gold. Higher throughput and recovery for the qua

  • GlobeNewswire

    Red Chris Block Cave Pre-Feasibility Study Confirms Low Cost, Long Life

    VANCOUVER, British Columbia, Oct. 11, 2021 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (the “Company”) (TSX:III) reports the highlights of the Red Chris Block Cave Pre-Feasibility Study (PFS) which confirms the potential to develop a world class, low cost, long life mine. Newcrest’s recently completed PFS indicates the project has an estimated 17% IRR and CAD$2.3 billion NPV over an initial 31 year mine life at prices of US$3.30 per pound copper and US$1500 per troy ounce gold. Some key resu