Canada markets close in 2 hours 23 minutes

E2Gold Inc. (ETU.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.03500.0000 (0.00%)
As of 01:17PM EST. Market open.
Full screen
Previous Close0.0350
Open0.0300
Bid0.0300 x N/A
Ask0.0350 x N/A
Day's Range0.0300 - 0.0350
52 Week Range0.0200 - 0.1850
Volume136,000
Avg. Volume141,030
Market Cap5.147M
Beta (5Y Monthly)N/A
PE Ratio (TTM)N/A
EPS (TTM)-0.1020
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • ACCESSWIRE

    Peter Bojtos Joins E2GOLD Board, Band-Ore Sampling Records Up to 23.60 Gold G/T

    E2Gold Inc. (TSXV:ETU)(OTCQB:ETUGF) (the "Company", "E2Gold") is pleased to announce the addition of Peter Bojtos, P.Eng., to its Board of Directors and also reports on recent exploration activities at its Band-Ore Project west of Thunder Bay. A property-wide prospecting program returned results including 23.60, 12.50, and 9.26 gold g/t in surface grab samples. These and other high-grade samples span a 6 km trend from north of the Main Zone, westward.

  • ACCESSWIRE

    E2GOLD Reports Band-Ore Sampling Results

    2022 / E2Gold Inc. (TSXV:ETU)(OTCQB:ETUGF) (the "Company" or "E2") is pleased to report on the results from the summer sampling program at its Band-Ore project near Thunder Bay, Ontario. Highlighted zones include 26.7 g/t Au over 2.0 m in a drill hole and 5.91 g/t Au over 1.8 m in trenches. Additionally, the Company has completed a seven hole, 1,000 m drill program testing two historic Resources1, the Main Zone and the No.

  • ACCESSWIRE

    Drilling Underway on E2Gold's Band-Ore Project

    E2Gold Inc. (TSXV:ETU)(OTCQB:ETUGF) (the "Company" or "E2Gold") is pleased to announce that its first drill program is underway on the Band-Ore gold project, located approximately 65 km west of Thunder Bay, in northwestern Ontario. The principal focus will be on the two historic resources, the "Main Zone" and the "No.