Canada Markets closed

EnGold Mines Ltd. (EGM.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.25000.0000 (0.00%)
At close: 03:41PM EST
Full screen
Loading interactive chart...
  • Newsfile

    EnGold to Resume Lac La Hache Drilling First Quarter of 2022, 2021 Program Concluded

    Vancouver, British Columbia--(Newsfile Corp. - December 13, 2021) - David H. Brett, President & CEO, EnGold Mines Ltd., (TSXV: EGM) ("EnGold" or the "Company") reports that EnGold has concluded it's 2021 deep drilling program at it's 100% owned Lac La Hache Copper Gold Project in the Cariboo region of BC, with extensive additional deep drilling set to resume in early February, 2022. 2021 drilling at Lac La Hache now totals 5,277.4 metres including ...

  • Newsfile

    EnGold Provides Lac La Hache Drilling Update

    Vancouver, British Columbia--(Newsfile Corp. - December 1, 2021) - David H. Brett, President & CEO, EnGold Mines Ltd., (TSXV: EGM) ("EnGold" or the "Company") reports that EnGold's fall-winter program has completed 4 deep holes using two drills (3,343 m), with two additional holes (1400 m) in progress. Drilling at the Ann North and G1 South areas indicate that anticipated mineralized zones in both areas are getting wider at depth. Due to backlogs at analytical ...

  • Newsfile

    EnGold Drilling at Lac La Hache Underway, Assays Pending

    Second Drill Expected October 1 Vancouver, British Columbia--(Newsfile Corp. - September 15, 2021) - David H. Brett, President & CEO, EnGold Mines Ltd., (TSXV: EGM) ("EnGold" or the "Company") reports that drilling at its 100% owned Lac La Hache Copper Gold Property in the Cariboo region of BC commenced September 10th. A 175 metre hole at the Road Gold Zone is complete with follow up drilling there pending assay results. The drill has now commenced ...