Canada markets close in 4 hours 54 minutes

Dios Exploration Inc. (DOS.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.06500.0000 (0.00%)
As of 10:00AM EST. Market open.
Full screen
Previous Close0.0650
Open0.0700
Bid0.0650 x 0
Ask0.0750 x 0
Day's Range0.0650 - 0.0700
52 Week Range0.0600 - 0.1300
Volume31,000
Avg. Volume142,692
Market Cap6.627M
Beta (5Y Monthly)1.91
PE Ratio (TTM)N/A
EPS (TTM)-0.0020
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • GlobeNewswire

    DIOS Completes Eastern K2 First Phase Drill Program

    MONTREAL, Oct. 28, 2021 (GLOBE NEWSWIRE) -- Dios Exploration Inc. (TSX-V: DOS) reports successful completion of first phase diamond drill program in eastern K2 gold-copper property, James Bay, Quebec. Some 2020 metres of drilling in 7 holes tested with success the following targets. 1) Sesame gold Target conductor, in northeast K2, a 2 km long airborne IP anomaly, was drilled for 664 m in 2 holes 400 m apart, cutting a 42-48 m wide foliated biotite-rich shear zone with 0.5 to 2 % disseminated py

  • GlobeNewswire

    DIOS Targets Strong First Priority Drilling Area in Eastern K2, With Related Gold & Copper In-Soil Clusters

    Dios wholly-owned K2 and AI target area Dios wholly owned K2 no royalty target area and AI target MONTREAL, Sept. 15, 2021 (GLOBE NEWSWIRE) -- Dios Exploration Inc. is very pleased to confirm strong first priority target area to be drilled in southeastern K2, with good related gold, copper and As in-soil anomaly clusters (very good B-horizon glacial material). Dios’ research work and ground field checks defined a very significant km size target (A48) area composed of a cherty iron formation with

  • GlobeNewswire

    DIOS K2 Diamond Drill Program Well in Progress

    MONTREAL, Aug. 31, 2021 (GLOBE NEWSWIRE) -- It is with great pleasure that management of Dios Exploration Inc. reports its current diamond drill program is progressing very well on wholly-owned K2 gold-copper property, James Bay, Quebec. The drilling rig and crew, helicopter and field teams were mobilized to site around mid-August, as expected. See July 7 release for detailed information on target drilling for this summer and later on. Please see Dios Quarterly Management report dated August 20