Canada Markets closed

Camino Minerals Corporation (COR.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.15000.0000 (0.00%)
At close: 3:59PM EST
Full screen
Previous Close0.1500
Open0.1500
Bid0.1500 x 0
Ask0.1550 x 0
Day's Range0.1500 - 0.1550
52 Week Range0.0800 - 0.1900
Volume276,125
Avg. Volume154,256
Market Cap15.375M
Beta (5Y Monthly)1.83
PE Ratio (TTM)N/A
EPS (TTM)-0.0190
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • Camino Intercepts 55.5 m @ 0.72% Cu and Near-Surface 64.5 m @ 0.6% Cu, on Its Los Chapitos Copper Property
    Newsfile

    Camino Intercepts 55.5 m @ 0.72% Cu and Near-Surface 64.5 m @ 0.6% Cu, on Its Los Chapitos Copper Property

    Vancouver, British Columbia--(Newsfile Corp. - January 19, 2021) - Camino Corp. (TSXV: COR) (OTCQB: CAMZF) (WKN: A116E1) ("Camino" or the "Company") is pleased to announce the results of the last four pending drill holes (Holes DCH-71, 72, 73, and 74) from the 2020 drill campaign on its Los Chapitos copper project located in Southern Peru's Arequipa Department. Significant intercepts in the remaining four drill holes of the 2020 campaign include DCH-071 with 55.5 ...

  • Camino Corporation Announces Further Drilling Results and New IOCG Alteration Zones at Its Los Chapitos Copper Property
    Newsfile

    Camino Corporation Announces Further Drilling Results and New IOCG Alteration Zones at Its Los Chapitos Copper Property

    Vancouver, British Columbia--(Newsfile Corp. - November 24, 2020) - Camino Corp. (TSXV: COR) (OTCQB: CAMZF) (WKN: A116E1) ("Camino" or the "Company") is pleased to announce results from the next four holes (DCH-67, 68, 69, and 70) in its 2020 campaign on its Los Chapitos copper project located in Southern Peru's Arequipa Department that commenced on October 2, 2020. There are four more additional drillholes that are pending assay results. Summary for all ...

  • Camino's First Drillhole Intercepts near Surface 92.1m @ 0.52% Cu (including 20.8m @ 0.97% Cu) on its Los Chapitos Property
    Newsfile

    Camino's First Drillhole Intercepts near Surface 92.1m @ 0.52% Cu (including 20.8m @ 0.97% Cu) on its Los Chapitos Property

    Vancouver, British Columbia--(Newsfile Corp. - October 26, 2020) - Camino Corp. (TSXV: COR) (OTC Pink: CAMZF) (WKN: A116E1) ("Camino" or the "Company") is pleased to announce the results from the first drillhole in the 2020, 3000m campaign on its Los Chapitos copper project located in Southern Peru's Arequipa Department. Drillhole DCH-066 intercepted 92.1m @ 0.52% Copper ("Cu") including 20.8m @ 0.97% Cu). The diamond drillhole was collared at the Carlotta outcrop that ...