Previous Close | 0.1500 |
Open | 0.1500 |
Bid | 0.1500 x 0 |
Ask | 0.1550 x 0 |
Day's Range | 0.1500 - 0.1550 |
52 Week Range | 0.0800 - 0.1900 |
Volume | 276,125 |
Avg. Volume | 154,256 |
Market Cap | 15.375M |
Beta (5Y Monthly) | 1.83 |
PE Ratio (TTM) | N/A |
EPS (TTM) | -0.0190 |
Earnings Date | N/A |
Forward Dividend & Yield | N/A (N/A) |
Ex-Dividend Date | N/A |
1y Target Est | N/A |
Vancouver, British Columbia--(Newsfile Corp. - January 19, 2021) - Camino Corp. (TSXV: COR) (OTCQB: CAMZF) (WKN: A116E1) ("Camino" or the "Company") is pleased to announce the results of the last four pending drill holes (Holes DCH-71, 72, 73, and 74) from the 2020 drill campaign on its Los Chapitos copper project located in Southern Peru's Arequipa Department. Significant intercepts in the remaining four drill holes of the 2020 campaign include DCH-071 with 55.5 ...
Vancouver, British Columbia--(Newsfile Corp. - November 24, 2020) - Camino Corp. (TSXV: COR) (OTCQB: CAMZF) (WKN: A116E1) ("Camino" or the "Company") is pleased to announce results from the next four holes (DCH-67, 68, 69, and 70) in its 2020 campaign on its Los Chapitos copper project located in Southern Peru's Arequipa Department that commenced on October 2, 2020. There are four more additional drillholes that are pending assay results. Summary for all ...
Vancouver, British Columbia--(Newsfile Corp. - October 26, 2020) - Camino Corp. (TSXV: COR) (OTC Pink: CAMZF) (WKN: A116E1) ("Camino" or the "Company") is pleased to announce the results from the first drillhole in the 2020, 3000m campaign on its Los Chapitos copper project located in Southern Peru's Arequipa Department. Drillhole DCH-066 intercepted 92.1m @ 0.52% Copper ("Cu") including 20.8m @ 0.97% Cu). The diamond drillhole was collared at the Carlotta outcrop that ...