Canada Markets close in 5 hrs 20 mins

Bengal Energy Ltd. (BNGLF)

Other OTC - Other OTC Delayed Price. Currency in USD
Add to watchlist
0.05240.0000 (0.00%)
As of 12:15PM EST. Market open.
Full screen
Trade prices are not sourced from all markets
Previous Close0.0524
Open0.0524
Bid0.0000 x 0
Ask0.0000 x 0
Day's Range0.0524 - 0.0524
52 Week Range0.0300 - 0.1100
Volume1,000
Avg. Volume2,633
Market Cap23.463M
Beta (5Y Monthly)3.23
PE Ratio (TTM)5.82
EPS (TTM)0.0090
Earnings DateNov. 04, 2021
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • Newsfile

    Bengal Energy Announces Chef-1 Exploration Well Update

    Calgary, Alberta--(Newsfile Corp. - December 30, 2021) - Bengal Energy Ltd. (TSX: BNG) ("Bengal" or the "Company") today announces that drilling of the Chef-1 exploration well, located in the Authority to Prospect 752 ("ATP 752") within the Barta sub-block, Potential Commercial Area 206 (PCA 206), has been completed. Following a review of the well logs, the ATP 752 joint venture parties have decided to plug and abandon the well. This exploration well is located ...

  • ACCESSWIRE

    The Power Play by The Market Herald releases new interviews with Bengal Energy, Gitennes, Baseload Energy, Railtown AI Technologies, Ridgeline, Discovery Silver, and Hank Payments

    VANCOUVER, BC / ACCESSWIRE / November 30, 2021 / The Power Play by The Market Herald has announced the release of new interviews with Bengal Energy, Gitennes, Baseload Energy, Railtown AI Technologies, Ridgeline, Discovery Silver, and Hank Payments discussing their latest press releases.The Power Play by The Market Herald provides investors with a quick snapshot of what they need to know about the company's latest press release through exclusive insights and interviews with company executives.

  • Newsfile

    Bengal Energy Announces Cuisinier Oil Field Water Injection Program Commencement

    Calgary, Alberta--(Newsfile Corp. - November 30, 2021) - Bengal Energy Ltd. (TSX: BNG) ("Bengal" or the "Company") is pleased to announce the Cuisinier Oil Field Water Injection Pilot Program commenced sustained water injection on November 12, 2021.The previously producing Cuisinier 24 ("C24") well was converted to a water injector with produced water from Cuisinier 7 pipelined to the C24 location and injected into the reservoir.Currently, the water injection rate is 377 barrels of water ...