Canada Markets closed

Aerojet Rocketdyne Holdings, Inc. (AJRD)

NYSE - Nasdaq Real Time Price. Currency in USD
Add to watchlist
42.93-0.91 (-2.08%)
At close: 04:00PM EST
42.93 0.00 (0.00%)
After hours: 04:31PM EST
Full screen
Trade prices are not sourced from all markets
Previous Close43.84
Open43.86
Bid42.54 x 800
Ask47.99 x 1100
Day's Range42.93 - 44.24
52 Week Range39.85 - 53.34
Volume584,604
Avg. Volume542,725
Market Cap3.456B
Beta (5Y Monthly)0.40
PE Ratio (TTM)24.96
EPS (TTM)N/A
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateMar. 09, 2021
1y Target EstN/A
All
News
  • GlobeNewswire

    NASA’s First Planetary Defense Mission Propelled by Aerojet Rocketdyne

    REDMOND, Wash., Nov. 24, 2021 (GLOBE NEWSWIRE) -- NASA’s first planetary defense mission—the Double Asteroid Redirection Test (DART)—launched from Vandenberg Space Force Base, California, on Nov. 23, equipped with a full suite of Aerojet Rocketdyne propulsion. The mission is designed to assess if kinetic impact is a reliable method to deflect asteroids. The DART spacecraft will be flown head-on into an asteroid to change its orbit. DART’s target is a small secondary body (or “moonlet”) orbiting

  • GlobeNewswire

    Aerojet Rocketdyne Holdings, Inc. Reports 2021 Third Quarter Results

    EL SEGUNDO, Calif., Oct. 26, 2021 (GLOBE NEWSWIRE) -- Aerojet Rocketdyne Holdings, Inc. (NYSE:AJRD) (the “Company”) today reported results for the three months ended September 30, 2021. Financial Overview Three months ended September 30, Nine Months ended September 30, 2021 2020 2021 2020 (In millions, except percentage and per share amounts)Net sales$545.3 $527.7 $1,598.3 $1,516.2 Net income42.6 31.7 105.7 102.3 Net income as a percentage of net sales7.8% 6.0 % 6.6% 6.7%Adjusted Net Income (Non

  • GlobeNewswire

    Aerojet Rocketdyne Completes Successful Space Launch System Rocket Engine Test Series

    STENNIS SPACE CENTER, Miss., Sept. 30, 2021 (GLOBE NEWSWIRE) -- Today’s RS-25 engine test at NASA’s Stennis Space Center completed the Retrofit-2 test series, which validated modernized, lower-cost components for new RS-25 engines to be used on the Space Launch System (SLS) heavy-lift rocket. RS-25 development test engine No. 0528 completed a full duration firing of 500 seconds and reached 109% of its originally designed Space Shuttle Main Engine power rating during the seventh and final Retrofi