Canada markets open in 2 hours 1 minute

Altiplano Metals Inc. (APN.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.1050+0.0150 (+16.67%)
At close: 03:47PM EDT
Full screen
Previous Close0.0900
Open0.1000
Bid0.1050 x 0
Ask0.1100 x 0
Day's Range0.1000 - 0.1050
52 Week Range0.0650 - 0.1850
Volume100,500
Avg. Volume57,704
Market Cap13.685M
Beta (5Y Monthly)2.44
PE Ratio (TTM)N/A
EPS (TTM)-0.0100
Earnings DateJun 04, 2024 - Jun 10, 2024
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • Newsfile

    Altiplano Reports Q1 2024 Operational Results at Farellon with 2.29% Copper Recovered in March

    Edmonton, Alberta--(Newsfile Corp. - May 7, 2024) - Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on Q1 2024 operation results from the Farellon Copper-Gold-Iron (Cu-Au-Fe) mine located near La Serena, Chile. For the Q1 2024 period, the copper grade produced at Farellon was recorded at 1.74%, a reduction from 1.87% observed in Q4 2023. However, very good grades were recovered from the 326 m NE mining ...

  • Newsfile

    Altiplano Reports Q4 2023 Operational Results at Farellon with Improved Cu Grade and Output

    Edmonton, Alberta--(Newsfile Corp. - February 29, 2024) - Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on Q4 2023 operation results from the Farellon Copper-Gold-Iron (Cu-Au-Fe) mine located near La Serena, Chile. The Company extracted a total of 9,114 tonnes of mineralized Cu-Au material and processed 8,125 tonnes during Q4 2023 at Farellon. This represents a 12% and 13.6% increase respectively from the Q3 production and processing ...

  • Newsfile

    Altiplano Reports on Processing Updates with Production of Cu-Au and Iron Concentrates at El Penon

    Edmonton, Alberta--(Newsfile Corp. - February 20, 2024) - Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on the progress at the El Peñón processing facility located approximately 15 kms from the Farellon copper-gold mine, 35 kms south of La Serena, Chile. As part of the ongoing optimization process at the processing facility, several refinements focusing on the milling and flotation processes have been completed for the crushing, ...