Advertisement
Canada markets closed
  • S&P/TSX

    22,167.03
    +59.95 (+0.27%)
     
  • S&P 500

    5,254.35
    +5.86 (+0.11%)
     
  • DOW

    39,807.37
    +47.29 (+0.12%)
     
  • CAD/USD

    0.7380
    -0.0006 (-0.08%)
     
  • CRUDE OIL

    83.11
    -0.06 (-0.07%)
     
  • Bitcoin CAD

    94,764.93
    -621.59 (-0.65%)
     
  • CMC Crypto 200

    885.54
    0.00 (0.00%)
     
  • GOLD FUTURES

    2,254.80
    +16.40 (+0.73%)
     
  • RUSSELL 2000

    2,124.55
    +10.20 (+0.48%)
     
  • 10-Yr Bond

    4.2060
    +0.0100 (+0.24%)
     
  • NASDAQ

    16,379.46
    -20.06 (-0.12%)
     
  • VOLATILITY

    13.01
    0.00 (0.00%)
     
  • FTSE

    7,952.62
    +20.64 (+0.26%)
     
  • NIKKEI 225

    40,369.44
    +201.37 (+0.50%)
     
  • CAD/EUR

    0.6847
    +0.0004 (+0.06%)
     

TomaGold provides an update on current and future activities at its Obalski, Star Lake and Brisk projects

TomaGold Corporation
TomaGold Corporation

TomaGold Corporation

Figure 1: Drilling program completed at Obalski
Figure 1: Drilling program completed at Obalski

MONTREAL, May 09, 2023 (GLOBE NEWSWIRE) -- TOMAGOLD CORPORATION (TSXV: LOT) (OTCQB: TOGOF) (“TomaGold” or the “Corporation”) is pleased to provide an update on current and future activities at its Obalski, Star Lake and Brisk projects.

Drilling program completed at Obalski

Following the recommendations of Abitibi Geophysics of Val-d'Or at the end of 2022, the Corporation drilled four holes for a total of 1,386.4 metres between April 11 and April 24, 2023 on its Obalski property. This program targeted two priority areas:

  • A north-northeast trending fault intersecting the A-Po Zone, which may contain remobilization of the A-Po Zone mineralization. Three holes (OBS-23-026 to OBS-23-28) were drilled on this structure for a total of 837.1 metres.

  • The eastern extension of the A-Po Zone which had not been previously explored. A 550-metre hole (OBS-23-29) was drilled on this “Metal Factor” anomaly.

LOT_Figure 1
LOT_Figure 1


Figure 1: Drilling program completed at Obalski

ADVERTISEMENT

The samples were shipped to ALS in Val-d'Or at the end of April. Results should be available by the end of May 2023.

Re-analysis of historical samples on Obalski

As reported in the April 5 press release, the processing of approximately 300 samples from historical drilling is still underway. Final results are expected by the end of May 2023.

Prospecting program on Star Lake and Brisk

The prospecting program on the Star Lake and Brisk properties is scheduled to begin at the end of May. These two properties are favourably located in the same geological context as the projects owned by Winsome Resources and Patriot Battery Metals (Brisk) and Brunswick Exploration (Star Lake). The work will be carried out by the Dahrouge Group. Approximately three weeks of work is planned and will consist mainly of identifying rock outcrops and collecting samples for analysis for lithium and rare earth elements. The teams will be equipped with a scintillometer and a portable XRF machine.

Upcoming drilling program on Obalski

The 2017 drilling program on Obalski outlined a significant NNE-SSW structure, which has not been followed up. Hole OB-17-002 had intercepted a 3.1 m mineralized structure that graded 10.3 g/t Au, 42.2 g/t Ag and 7.8% Cu. The Corporation plans to carry out a 1,000 m drilling program on this structure in early June 2023.

“Over the coming months, we will be active on our three main projects, all of which have excellent exploration potential,” said David Grondin, President and CEO of TomaGold. “Our exploration strategy is to gather as much data as possible to optimize our chances of success when we drill, and with the minimum investment possible. This strategy has allowed us to make important discoveries in the past such as Monster Lake, and we anticipate that it will also be successful for Obalski, Star Lake and Brisk.”

The technical content of this press release has been reviewed and approved by André Jean, P.Eng., the Corporation’s Director of Exploration and a qualified person under National Instrument 43-101.

About the Obalski property
The Obalski property covers 345 hectares about 2 km south of Chibougamau, Quebec. Discovered in 1928, the Obalski deposit produced 100,273 tonnes at grades of 1.14% Cu, 2.08 g/t Au and 6.04 g/t Ag from the A zone between 1964 to 1972, and around 9,000 tonnes at a reported grade of 8.5 g/t Au from the D zone in 1984 (Source: SIGEOM and Camchib Exploration internal reports).

About TomaGold
TomaGold Corporation (TSXV: LOT) (OTCQB: TOGOF) is a Canadian mineral exploration company engaged in the acquisition, assessment, exploration and development of gold, copper, rare earth elements and lithium projects. TomaGold holds interests in five gold properties near the Chibougamau mining camp in northern Quebec: Obalski, Monster Lake East, Monster Lake West, Hazeur and Doda Lake, as well as a 24.5% interest through a joint venture with Evolution Mining Ltd. and New Gold Inc. in the Baird property, located near the Red Lake mining camp in Ontario. In addition, it owns a 100% interest in a lithium property and in the Star Lake rare earth elements property, located in the James Bay region of Quebec.

Contact:
David Grondin
President and Chief Executive Officer
(514) 583-3490
www.tomagoldcorp.com

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. Some of the statements contained in this press release are forward-looking statements within the meaning of applicable securities laws. Forward-looking statements can be identified by the use of words such as “expects”, “intends”, “is expected”, “potential”, “suggests” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “should”, “might” or “will” be taken, occur or be achieved. Forward-looking statements are not historical facts and are subject to a number of risks and uncertainties beyond the Corporation’s control. Readers are cautioned that such statements are not guarantees of future performance and that actual results and developments are likely to differ, and may differ materially, from those expressed or implied by the forward-looking statements contained in this press release. Accordingly, readers should not place undue reliance on forward-looking statements. The Corporation undertakes no obligation to publicly update or revise any forward-looking statements, except as required by law.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/9ac5802f-1e3f-4b03-8239-4be4bfb60c0c