Advertisement
Canada markets closed
  • S&P/TSX

    21,807.37
    +98.93 (+0.46%)
     
  • S&P 500

    4,967.23
    -43.89 (-0.88%)
     
  • DOW

    37,986.40
    +211.02 (+0.56%)
     
  • CAD/USD

    0.7275
    +0.0012 (+0.16%)
     
  • CRUDE OIL

    83.24
    +0.51 (+0.62%)
     
  • Bitcoin CAD

    87,350.95
    +645.09 (+0.74%)
     
  • CMC Crypto 200

    1,372.94
    +60.32 (+4.59%)
     
  • GOLD FUTURES

    2,406.70
    +8.70 (+0.36%)
     
  • RUSSELL 2000

    1,947.66
    +4.70 (+0.24%)
     
  • 10-Yr Bond

    4.6150
    -0.0320 (-0.69%)
     
  • NASDAQ

    15,282.01
    -319.49 (-2.05%)
     
  • VOLATILITY

    18.71
    +0.71 (+3.94%)
     
  • FTSE

    7,895.85
    +18.80 (+0.24%)
     
  • NIKKEI 225

    37,068.35
    -1,011.35 (-2.66%)
     
  • CAD/EUR

    0.6824
    +0.0003 (+0.04%)
     

Orestone Completes Drilling at Captain Gold-Copper Porphyry Target

Vancouver, British Columbia--(Newsfile Corp. - February 17, 2022) - Orestone Mining Corp. (TSXV: ORS) (FSE: O2R1) is pleased to announce that further to its news release of Jan 24, 2022, the Phase I drill program has been completed on the Captain gold-copper project near Fort St James, North Central British Columbia. The program consisted of one NQ size diamond core drill hole to a total depth of 774 meters. A total of 89 samples have been shipped to Activation Laboratories Ltd. (Actlabs) in Kamloops, BC for analysis with results anticipated in six to eight weeks.

Additional information will be released as it becomes available.

The 100 percent owned Captain gold-copper project encompasses 37 square kilometres and hosts a large porphyry system located 41 kilometres north of Fort St. James and 30 kilometres south of the Mt. Milligan copper-gold mine in North Central British Columbia. The Captain Project is in relatively flat terrain, with moderate tree cover and an extensive network of logging and Forest Service roads suitable for exploration year around. To stay informed of the latest corporate activities please click here to provide consent and receive news and updates. For more information, please visit Orestone's website at www.orestone.ca.

ADVERTISEMENT

Quality assurance/quality control procedures

Orestone Mining has implemented a rigorous quality assurance/quality control program to ensure best practices in work programs by the company and contractors including sampling and analysis of diamond drill core as well as geophysical surveys and other work done on the property.

Gary Nordin, P.Geo, a Director of the Company, is a qualified person as defined by National Instrument 43-101. Mr. Nordin has reviewed and approved the technical information in this press release.

ON BEHALF OF ORESTONE MINING CORP.

David Hottman

CEO

For further information contact: David Hottman at 604-629-1929
info@orestone.ca

407 – 325 Howe Street, Vancouver, BC V6C 1Z7, Canada
Phone: 604-629-1929
Fax: 604-629-1930
www.orestone.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this News Release. This news release has been prepared by management and no regulatory authority has approved or disapproved the information contained herein.

Forward-Looking Statements

This news release contains certain forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. Readers are cautioned that these forward-looking statements are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results to differ materially from those expected including, but not limited to, market conditions, availability of financing, currency rate fluctuations, actual results of exploration and development activities, environmental risks, future prices of copper, gold, silver and other metals, operating risks, accidents, labor issues, delays in obtaining governmental or regulatory approvals and permits, and other risks in the mining industry. In addition, there is uncertainty about the spread of the COVID-19 virus and the impact it will have on the Company's operations, global supply chains and economic activity in general. All the forward-looking statements made in this news release are qualified by these cautionary statements and those in our continuous disclosure filings available on SEDAR at www.sedar.com. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances save as required by applicable law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/114078