Advertisement
Canada markets closed
  • S&P/TSX

    21,873.72
    -138.00 (-0.63%)
     
  • S&P 500

    5,071.63
    +1.08 (+0.02%)
     
  • DOW

    38,460.92
    -42.77 (-0.11%)
     
  • CAD/USD

    0.7298
    +0.0001 (+0.01%)
     
  • CRUDE OIL

    82.75
    -0.06 (-0.07%)
     
  • Bitcoin CAD

    88,265.11
    -2,877.16 (-3.16%)
     
  • CMC Crypto 200

    1,389.85
    -34.25 (-2.40%)
     
  • GOLD FUTURES

    2,330.10
    -8.30 (-0.35%)
     
  • RUSSELL 2000

    1,995.43
    -7.22 (-0.36%)
     
  • 10-Yr Bond

    4.6520
    +0.0540 (+1.17%)
     
  • NASDAQ futures

    17,463.25
    -201.25 (-1.14%)
     
  • VOLATILITY

    15.97
    +0.28 (+1.78%)
     
  • FTSE

    8,040.38
    -4.43 (-0.06%)
     
  • NIKKEI 225

    37,995.52
    -464.56 (-1.21%)
     
  • CAD/EUR

    0.6818
    -0.0001 (-0.01%)
     

Moneta Intersects Widespread Gold Mineralization Confirming Continuity on the Windjammer Deposit at Tower Gold

Toronto, Ontario--(Newsfile Corp. - October 18, 2022) - Moneta Gold Inc. (TSX: ME) (OTCQX: MEAUF) (XETRA: MOP) ("Moneta") is pleased to announce assay results from seventeen (17) drill holes from infill drilling on the Windjammer gold deposit at the Tower Gold project, located 100 kilometres ("km") east of Timmins, Ontario. The drilling was conducted as part of the current 70,000 metres ("m") infill and resource upgrade drill program on the recently announced mineral resource estimate of 4.5 million ("M") ounces ("oz") indicated gold ("Au") and 8.3 Moz inferred Au (see September 07, 2022 press release) at the Tower Gold project.

Drilling Highlights:

  • MGH22-298 intersected 158.00 m @ 0.55 grams per tonne "g/t" Au, including 55.00 m @ 0.79 g/t Au, including 20.00 m @ 1.05 g/t Au, including 1.00 m @ 4.26 g/t Au, and 1.00 m @ 6.11 g/t Au

  • MGH22-323 intersected 125.80 m @ 0.50 g/t Au, including 7.00 m @ 0.87 g/t Au, including 12.50 m @ 1.83 g/t Au, including 1.00 m @ 5.69 g/t Au

  • MGH22-316 intersected 232.00 m @ 0.35 g/t Au, including 20.00 m @ 0.53 g/t Au, and 14.00 m @ 0.73 g/t Au, and 24.50 m @ 0.54, including 1.00 m @ 2.49 g/t Au

  • MGH22-307 intersected 285.50 m @ 0.34 g/t Au, including 29.00 m @ 0.53 g/t Au, including 1.00 m @ 4.28 g/t Au, and 13.00 m @ 0.62 g/t Au, including 2.00 m @ 1.86 g/t Au, and 12.00 m @ 0.84 g/t Au, including 5.10 m @ 1.22 g/t Au

  • MGH22-294 intersected 27.00 m @ 0.81 g/t Au, including 10.00 m @ 1.73 g/t Au, including 4.00 m @ 3.56 g/t Au, including 1.20 m @ 6.90 g/t Au

  • MGH21-273 intercepted 50.00 m @ 0.47 g/t Au, including 8.00 m @ 0.84 g/t Au, including 1.00 m @ 1.35 g/t Au

  • MGH22-317 intersected 161.00 m @ 0.39 g/t Au, including 18.00 m @ 1.53 g/t Au, including 6.60 m @ 2.39 g/t Au, including 1.60 m @ 4.21 g/t Au, and 1.00 m @ 6.91 g/t Au

  • MGH22-312 intersected 83.00 m @ 0.40 g/t Au, including 38.00 m @ 0.51 g/t Au, including 9.00 m @ 0.77 g/t Au, including 1.00 m @ 1.64 g/t Au

ADVERTISEMENT

Intercepts are calculated using a 0.20 g/t Au cut-off, a maximum of 5m internal dilution and no top cap applied. Drill intercepts are not true widths, are reported as drill widths, and are estimated to be 75% to 95% of true width.

Gary O'Connor, Moneta's President and Chief Executive Officer, commented, "These latest assay results from Windjammer infill drilling continue to confirm the continuity and extensions of the current mineral resource estimate, only just updated in September. These results support wide widths of gold mineralization within the open pit mineral resources and affirm extensions of mineralization outside the resource to the east and at depth. As we continue to advance and de-risk the Tower Gold project, we look forward to completing the resource infill and upgrade drill program in preparation of the planned Pre-Feasibility Study and releasing additional results from the drill program as they become available."

The latest assay results are from seventeen (17) drill holes for 8,205.0 m of diamond drilling completed at Windjammer as part of an initial 70,000 m drill program planned as resource infill and upgrade drilling. Two (2) drill holes (MGH22-313A and MGH22-294A) did not reach targeted depth and were redrilled to completion as MGH22-313 and MGH22-294. Drilling is being conducted on 50 m centres as step-outs and infill of previous drill holes.



Figure 1: Tower Gold Project - General Location Map

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/4852/140873_6b332db5f45269d6_002full.jpg

Table 1: Selected Significant Drill Results

Hole

From

To

Length

Au

Gram metres

(#)

(m)

(m)

(m)

(g/t)

(g x m)

MGH21-270

275.00

297.00

22.00

0.34

7.5

includes

279.00

289.00

10.00

0.56

5.6

includes

281.00

283.00

2.00

1.46

2.9

MGH21-270

305.00

331.00

26.00

0.51

13.3

includes

307.00

323.00

16.00

0.67

10.7

includes

311.00

313.00

2.00

2.06

4.1

MGH21-271

276.00

349.00

73.00

0.29

21.2

includes

276.00

294.00

18.00

0.46

8.3

includes

282.00

284.00

2.00

1.36

2.7

MGH21-271

394.50

424.00

29.50

0.42

12.4

includes

415.00

417.00

2.00

1.24

2.5

MGH21-271

431.00

437.35

6.35

0.69

4.4

includes

436.00

437.35

1.35

1.94

2.6

MGH21-273

118.00

166.00

48.00

0.44

21.1

includes

132.00

148.00

16.00

0.94

15.0

includes

132.00

134.00

2.00

5.55

11.1

MGH21-273

307.00

319.00

12.00

0.80

9.6

includes

307.00

315.00

8.00

1.11

8.9

includes

313.00

315.00

2.00

1.69

3.4

MGH21-273

327.00

413.00

86.00

0.35

30.1

includes

353.00

361.00

8.00

1.60

12.8

includes

357.00

359.00

2.00

3.16

6.3

MGH21-273

441.00

491.00

50.00

0.47

23.5

includes

475.00

483.00

8.00

0.84

6.7

includes

475.00

476.00

1.00

1.35

1.4

MGH21-273

517.10

521.94

4.84

1.22

5.9

includes

518.00

519.00

1.00

5.12

5.1

MGH22-294

119.00

146.00

27.00

0.81

21.9

includes

135.00

145.00

10.00

1.73

17.3

includes

141.00

145.00

4.00

3.56

14.2

includes

143.00

145.00

2.00

5.83

11.7

includes

143.00

144.20

1.20

6.90

8.3

MGH22-294

150.00

165.00

15.00

0.61

9.2

includes

160.00

165.00

5.00

1.07

5.4

includes

164.00

165.00

1.00

4.78

4.8

MGH22-294

220.00

234.00

14.00

0.44

6.2

includes

224.00

228.00

4.00

1.14

4.6

includes

224.00

225.00

1.00

3.45

3.5

MGH22-294

323.00

338.00

15.00

0.47

7.1

includes

327.00

332.00

5.00

1.05

5.3

includes

330.00

332.00

2.00

1.47

2.9

MGH22-297

68.00

72.90

4.90

0.62

3.0

includes

72.00

72.90

0.90

2.62

2.4

MGH22-297

247.00

265.00

18.00

0.49

8.8

MGH22-298

136.60

164.00

27.40

0.34

9.3

includes

156.00

157.00

1.00

2.52

2.5

MGH22-298

226.00

257.00

31.00

0.38

11.8

includes

236.70

248.00

11.30

0.76

8.6

includes

242.80

248.00

5.20

1.11

5.8

includes

247.00

248.00

1.00

2.02

2.0

MGH22-298

264.00

422.00

158.00

0.55

86.9

includes

322.00

377.00

55.00

0.79

43.5

includes

322.00

342.00

20.00

1.05

21.0

includes

328.00

334.00

6.00

1.54

9.2

includes

328.00

329.00

1.00

4.26

4.3

and

371.00

372.00

1.00

6.11

6.1

MGH22-298

464.50

562.00

97.50

0.29

28.3

includes

513.20

527.50

14.30

0.58

8.3

includes

513.20

516.20

3.00

0.91

2.7

MGH22-302

345.00

349.00

4.00

0.69

2.8

includes

345.00

347.00

2.00

1.12

2.2

MGH22-307

106.00

139.00

33.00

0.34

11.2

includes

133.00

139.00

6.00

0.74

4.4

includes

133.00

134.10

1.10

2.10

2.3

MGH22-307

149.00

171.00

22.00

0.48

10.6

includes

164.00

166.00

2.00

2.44

4.9

includes

165.00

166.00

1.00

2.44

2.4

MGH22-307

186.00

238.10

52.10

0.39

20.3

includes

196.00

226.00

30.00

0.59

17.7

includes

196.00

205.10

9.10

1.46

13.3

includes

196.00

197.00

1.00

2.59

2.6

and

204.00

205.10

1.10

9.07

10.0

MGH22-307

225.00

510.50

285.50

0.34

97.5

includes

308.00

337.00

29.00

0.53

15.4

includes

333.70

337.00

3.30

2.00

6.6

includes

336.00

337.00

1.00

4.28

4.3

and

405.00

418.00

13.00

0.62

8.1

includes

405.00

407.00

2.00

1.86

3.7

and

453.00

465.00

12.00

0.84

10.1

includes

459.90

465.00

5.10

1.22

6.2

MGH22-312

153.00

236.00

83.00

0.40

33.2

includes

174.00

212.00

38.00

0.51

19.4

includes

174.00

183.00

9.00

0.77

6.9

includes

174.00

175.00

1.00

1.64

1.6

and

180.00

183.00

3.00

1.11

3.3

MGH22-312

276.00

334.00

58.00

0.34

19.7

includes

313.00

318.00

5.00

1.13

5.7

MGH22-312

460.00

488.00

28.00

0.31

8.7

includes

462.00

468.00

6.00

0.68

4.1

includes

466.00

468.00

2.00

1.17

2.3

MGH22-312

632.00

655.00

23.00

0.47

10.8

includes

632.00

641.00

9.00

0.64

5.8

MGH22-313

212.00

293.00

81.00

0.30

24.3

includes

245.00

246.00

1.00

1.39

1.4

and

252.00

263.00

11.00

0.40

4.4

and

292.00

293.00

1.00

1.31

1.3

MGH22-313

417.00

442.00

25.00

0.40

10.0

includes

422.00

437.50

15.50

0.51

7.9

includes

434.40

437.50

3.10

1.21

3.8

includes

434.40

434.85

0.45

3.76

1.7

MGH22-316

188.00

420.00

232.00

0.35

81.2

includes

252.00

272.00

20.00

0.53

10.6

and

256.00

257.00

1.00

1.46

1.5

and

293.00

307.00

14.00

0.73

10.2

includes

293.00

299.00

6.00

1.07

6.4

includes

295.15

296.00

0.85

1.69

1.4

includes

343.00

355.00

12.00

0.58

7.0

includes

343.00

348.10

5.10

0.76

3.9

includes

343.00

344.25

1.25

1.89

2.4

includes

388.50

413.00

24.50

0.54

13.2

includes

388.50

390.00

1.50

2.25

3.4

and

412.00

413.00

1.00

2.49

2.5

MGH22-317

74.00

235.00

161.00

0.39

62.8

includes

107.00

125.00

18.00

1.53

27.5

includes

107.00

113.60

6.60

2.39

15.8

includes

107.00

110.60

3.60

3.15

11.3

includes

109.00

110.60

1.60

4.21

6.7

and

124.00

125.00

1.00

6.91

6.9

MGH22-323

167.00

201.50

34.50

0.33

11.4

includes

171.00

179.00

8.00

0.63

5.0

includes

176.00

177.00

1.00

2.05

2.1

MGH22-323

592.56

595.70

3.14

3.32

10.4

MGH22-323

243.00

368.80

125.80

0.50

62.9

includes

292.00

299.00

7.00

0.87

6.1

includes

297.50

299.00

1.50

2.39

3.6

and

319.50

332.00

12.50

1.83

22.9

includes

326.00

327.00

1.00

5.69

5.7

 

Note: Intercepts are calculated using a 0.20 g/t Au cut-off, a maximum of 5m internal dilution and no top cap applied. Drill intercepts are not true widths, are reported as drill widths, and are estimated to be 75% to 95% of true width.

Discussion of Drill Results

Windjammer

Infill drilling at Windjammer was focused on infilling and extending the wide stacked extensional quartz veins hosting the current open pit gold resource from surface to vertical depths of up of 500 m below surface at Windjammer Central. The drill results confirmed continuity of the resource estimate and extended gold mineralization to the east and at depth. The Windjammer open pit currently hosts an indicated resource of 42.05 million tonnes ("Mt") @ 0.78 g/t Au containing 1,058,000 oz gold and an inferred resource of 34.46 Mt @ 0.97 g/t Au containing 1,074,000 oz gold at Windjammer South and 28.50 Mt @ 0.63 g/t Au for 581,000 oz gold indicated and 77.83 Mt @ 0.64 g/t Au for 1,595,000 oz gold inferred at Windjammer Central (see September 07, 2022 press release). The drill holes predominantly tested the areas north of the regional banded iron formation units ("BIF") within altered clastic sediments hosting stacked vein sets in the Windjammer Central area.



Figure 2: Windjammer - Tower Gold: Infill Drill Location Map

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/4852/140873_6b332db5f45269d6_003full.jpg

Table 2: Resource Infill Drill Hole Details

Hole

Easting

Northing

Elevation

Azimuth

Inclination

Depth

(#)

(mE)

(mN)

(masl)

(°)

(°)

(m)

MGH21-270

572502

5370708

361

75

-60

402.0

MGH21-271

572304

5370651

333

75

-60

493.0

MGH21-273

572103

5370596

329

75

-60

522.0

MGH22-294

572124

5370544

330

80

-60

549.0

MGH22-294A

572121

5370541

330

80

-60

69.0

MGH22-297

572293

5370600

323

50

-60

504.0

MGH22-298

572142

572142

329

75

-60

710.0

MGH22-302

572497

5370640

356

84

-60

447.0

MGH22-307

572268

5370748

331

75

-60

705.0

MGH22-312

572358

5370715

338

75

-60

663.0

MGH22-313

572461

5369568

356

76

-60

507.0

MGH22-313A

572463

5370765

356

76

-60

162.0

MGH22-316

572353

5370672

337

75

-60

501.0

MGH22-317

572438

5370900

353

75

-60

600.0

MGH22-322

572453

5370697

348

75

-60

501.0

MGH22-323

572417

5370793

345

75

-60

507.0

MGH22-327

572544

5370724

364

75

-60

363.0

 



Figure 3: Windjammer - Tower Gold: Infill Drilling Cross Section

To view an enhanced version of Figure 3, please visit:
https://images.newsfilecorp.com/files/4852/140873_6b332db5f45269d6_004full.jpg

QA/QC Procedures

Drill core is oriented and cut with half sent to AGAT Laboratories Inc. (AGAT) for drying and crushing to -2 mm, with a 1.00 kg split pulverized to -75 µm (200#). AGAT is an ISO 17025 accredited laboratory. A 50 g charge is Fire Assayed and analyzed using an AAS finish for Gold. Samples above 10.00 g/t Au are analyzed by Fire Assay with a gravimetric finish and selected samples with visible gold or high-grade mineralization are assayed by Metallic Screen Fire Assay on a 1.00 kg sample. Moneta inserts independent certified reference material and blanks with the samples and assays routine pulp repeats and coarse reject sample duplicates, as well as completing routine third-party check assays at Activation Laboratories Ltd. Jason Dankowski, P.Geo. V.P. Technical Services & Geology for Moneta, who is a QP as defined by NI 43-101 has reviewed and approved the technical contents of this press release.

About Moneta Gold

Moneta is a Canadian-based gold exploration company focused on advancing its 100% wholly owned Tower Gold project, located in the Timmins region of Northeastern Ontario, Canada's most prolific gold producing camp. The September 2022, Preliminary Economic Assessment study outlined a combined open pit and underground mining and a 7.0 million tonne per annum conventional leach/CIL operation over a 24-year mine life, with 4.6 Moz of recovered gold, generating an after-tax NPV5% of $1,066M, IRR of 31.7%, and a 2.6-year payback at a gold price US$1,600/oz. Tower Gold hosts an estimated gold mineral resource of 4.5 Moz indicated and 8.3 Moz inferred. Moneta is committed to creating shareholder value through the strategic allocation of capital and a focus on the current resource upgrade drilling program, while conducting all business activities in an environmentally and socially responsible manner.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Gary V. O'Connor, CEO
416-357-3319

Linda Armstrong, Investor Relations
647-456-9223

The Company's public documents may be accessed at www.sedar.com. For further information on the Company, please visit our website at www.monetagold.com or email us at info@monetagold.com.

This news release includes certain forward-looking information and forward-looking statements, collectively "forward-looking statements" within the meaning of applicable securities legislation. Forward-looking statements are frequently identified by such words as "may", "will", "plan", "expect", "anticipate", "estimate", "intend" and similar words referring to future events and results. Forward-looking statements include but are not limited to information with respect to the closing of the Offering, the use of proceeds, the timing of the renunciation and tax treatment of the Flow Through Shares as well as future performance of the business, its operations and financial performance and condition such as the Corporation's drilling program. Forward-looking statements are subject to inherent risks and uncertainties including without limitation the impact of COVID-19 related disruptions in relation to the Corporation's business operations including upon its employees, suppliers, facilities and other stakeholders; uncertainties and risk that have arisen and may arise in relation to travel, and other financial market and social impacts from COVID-19 and responses to COVID 19 and the ability of the Corporation to finance and carry out its anticipated goals and objectives. International conflicts and other geopolitical risks, including war, military action, terrorism, trade and financial sanctions, which have historically led to, and may in the future lead to, uncertainty or volatility in global commodity and financial markets and supply chains; the impact of Russia's invasion of Ukraine and the widespread international condemnation has had a significant destabilizing effect on world commodity prices, supply chains, inflation risk, and global economies more broadly, may adversely affect the Corporation's business, financial condition, and results of operations.

Forward-looking statements are based on the current opinions and expectations of management. All forward-looking information is inherently uncertain and subject to a variety of assumptions, risks and uncertainties, including the speculative nature of mineral exploration and development, fluctuating commodity prices, competitive risks and the availability of financing, as described in more detail in our recent securities filings available at www.sedar.com. Actual events or results may differ materially from those projected in the forward looking-statements and we caution against placing undue reliance thereon. We assume no obligation to revise or update these forward-looking statements.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/140873