Advertisement
Canada markets close in 3 hours 42 minutes
  • S&P/TSX

    22,183.74
    +76.66 (+0.35%)
     
  • S&P 500

    5,252.37
    +3.88 (+0.07%)
     
  • DOW

    39,792.57
    +32.49 (+0.08%)
     
  • CAD/USD

    0.7387
    +0.0014 (+0.19%)
     
  • CRUDE OIL

    82.49
    +1.14 (+1.40%)
     
  • Bitcoin CAD

    95,898.87
    +2,982.70 (+3.21%)
     
  • CMC Crypto 200

    885.54
    0.00 (0.00%)
     
  • GOLD FUTURES

    2,235.60
    +22.90 (+1.03%)
     
  • RUSSELL 2000

    2,134.88
    +20.54 (+0.97%)
     
  • 10-Yr Bond

    4.1850
    -0.0110 (-0.26%)
     
  • NASDAQ

    16,390.10
    -9.43 (-0.06%)
     
  • VOLATILITY

    12.85
    +0.07 (+0.55%)
     
  • FTSE

    7,964.01
    +32.03 (+0.40%)
     
  • NIKKEI 225

    40,168.07
    -594.66 (-1.46%)
     
  • CAD/EUR

    0.6839
    +0.0034 (+0.50%)
     

Jayden Begins 6000m Drill Program at Storm Lake

Vancouver, British Columbia --News Direct-- Jayden Resources Inc.

Jayden Resources Inc.
Jayden Resources Inc.

Vancouver, B.C. - TheNewswire - October 18, 2021 - Jayden Resources Inc., ("Jayden" or "the Company") (TSXV:JDN) (OTC:PNMLF) announces that the Company has arranged up to a 6,000 meter diamond drill program on its Storm Lake gold property (“Storm Lake”) located in the Frotet-Evans Greenstone Belt in central Quebec.

Storm Lake consists of 48 contiguous claims that cover a gross area of approximately 2,610 hectares. Previous exploration on the property from various other companies includes 49 drill holes totaling 9,600 meters and 8 showings (7 Gold and 1 Silver).

ADVERTISEMENT

Pursuant to a NI43-101 Technical Report on Storm Lake dated August 25, 2021 (which can be found at www.jaydenresources.com) that recommended an exploration program estimated to cost $2.7M, including various ground surveys and a property wide exploration drill program.

Jayden recently completed the Phase I work and will advance the recommended Phase II drill program from 5,000 meters to up to 6,000 meters to include drilling on some new zones of interest recently identified. See below for a map showing the location of the planned 2021 drill holes or follow this link: https://jaydenresources.com/news/2021-drill-program/

Click Image To View Full Size

Jayden has contracted Laurentia Exploration based in Saguenay, Quebec to oversee the program. Jayden’s President & CEO, David Eaton commented, “The Company was anxious to begin work on Storm Lake before the year end and looks forward to some positive results so we can advance the property even further beginning next spring”

Technical information in this press release was reviewed by Maxime Bouchard, P.Geo., M.Sc., recognized as a Qualified Person under the guidelines of National Instrument 43-101. The Qualified Person has not completed sufficient work to verify the historic information on the Property, particularly in regards to historical drill results. However, the Qualified Person believes that drilling and analytical results were completed to industry standard practices. The information provides an indication of the exploration potential of the Property but may not be representative of expected results.

For further information about this news release or the Company visit our website at www.jaydenresources.com, email info@jaydenresources.com, or call Mike Thast at 778-331-2093.

On Behalf of the Board:

"David Eaton"

President and CEO

FORWARD LOOKING STATEMENTS: This document includes forward-looking statements as well as historical information. Forward-looking statements include, but are not limited to, the continued advancement of the company's general business development, research development and the Company's development of mineral exploration projects. When used in this document, the words "anticipate", "believe", "estimate", "expect", "intent", "may", "project", "plan", "should" and similar expressions may identify forward-looking statements. Jayden Resources Inc. believes that their expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements. Important factors that could cause actual results to differ from these forward-looking statements include the potential that fluctuations in the marketplace for the sale of minerals, the inability to implement corporate strategies, the ability to obtain financing and other risks disclosed in our filings made with Canadian Securities Regulators.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

View source version on newsdirect.com: https://newsdirect.com/news/jayden-begins-6000m-drill-program-at-storm-lake-225913211