Advertisement
Canada markets close in 3 hours 52 minutes
  • S&P/TSX

    21,662.92
    -77.28 (-0.36%)
     
  • S&P 500

    5,057.12
    -4.70 (-0.09%)
     
  • DOW

    37,871.30
    +136.19 (+0.36%)
     
  • CAD/USD

    0.7236
    -0.0018 (-0.24%)
     
  • CRUDE OIL

    85.52
    +0.11 (+0.13%)
     
  • Bitcoin CAD

    85,649.06
    -3,906.23 (-4.36%)
     
  • CMC Crypto 200

    885.54
    0.00 (0.00%)
     
  • GOLD FUTURES

    2,402.80
    +19.80 (+0.83%)
     
  • RUSSELL 2000

    1,967.96
    -7.75 (-0.39%)
     
  • 10-Yr Bond

    4.6550
    +0.0270 (+0.58%)
     
  • NASDAQ

    15,871.47
    -13.54 (-0.09%)
     
  • VOLATILITY

    18.23
    -1.00 (-5.21%)
     
  • FTSE

    7,820.36
    -145.17 (-1.82%)
     
  • NIKKEI 225

    38,471.20
    -761.60 (-1.94%)
     
  • CAD/EUR

    0.6807
    -0.0017 (-0.25%)
     

IDM Mining Provides Corporate Update

VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 22, 2015) - IDM Mining Ltd. (IDM.TO) ("IDM" or the "Company") is pleased to provide an update on the design, development, permitting and further exploration at the Red Mountain underground gold project, located 15 km east of Stewart in northwestern BC.

CORPORATE UPDATE

Since the agreement to acquire the Red Mountain Property was announced in May 2014, the Company has completed a number of key activities that have advanced the project towards development as a high-value underground gold mine and addressed several key corporate related issues. A summary of these include:

  • In July 2014, the Company announced positive results from a NI 43-101 compliant Preliminary Economic Assessment (PEA) and revised Resource Estimate completed by JDS Energy & Mining Ltd. (see IDM news release dated July 23, 2014). The study demonstrates potential robust economics for a high-grade underground mine, with low capital ($76 million) and operating costs ($456 US dollars/ounce net of silver byproduct) and a post-tax payback period of 1.5 years. The recent decline in the Canadian dollar would potentially result in even better economics, with the PEA base-case foreign exchange at $0.95 CAD:USD.

  • Completed a successful property-wide surface exploration and drilling program, discovering new gold mineralization at the 141 Zone, Marc Zone extension and Cambria Zone, all located outside the resource area.

  • Completed sampling of historic drill core at the 141 Zone; combined with 2014 drilling, suggests an extensive, high-grade gold system running parallel to the resource area and wide open for expansion.

  • In the fall of 2014, the Company submitted a Project Description (the "Project Description") report to the British Columbia Environment Assessment Office ("BC EAO") for the Red Mountain Underground Gold Project (the "Project"), located 15 kilometers northeast of Stewart, British Columbia. Comments have been received on the report from BC EAO, other provincial and federal agencies and First Nations. The Company intends to submit a final Project Description by July 2015 and this will formally initiate the environmental assessment review of the Project.

  • Initiated discussions with the Nisga'a Nation in regards to the Red Mountain project and have actively engaged with their leadership with a view to building a long term, positive relationship between the Company, our employees and the Nisga'a community.

  • Made first of two $1 million pre-development option payments to Seabridge Gold and have exceeded first year spending commitments towards securing ownership of the Red Mountain asset.

  • In regards to IDM corporately, management and the Board of Directors have been engaged in a prudent and strategic process to significantly lower overhead costs, sell or release properties that are not core to the company's future (primarily properties located in Mexico) and tightly manage project budgets in order to position the company for long term success.

ADVERTISEMENT

PLANS FOR 2015 FIELD SEASON AND BEYOND

The focus of the Company is to secure project financing with proceeds to advance the permitting and engineering of the Red Mountain Project, to support a potential positive investment decision; the Company aims to potentially proceed to development in early 2016. On May 19th, 2015, the Company announced a non-brokered private placement offering to raise gross proceeds of up to $2 million, with use of proceeds intended to continue this process.

In regards to permitting, pursuant to section 10 of the BC Environmental Assessment Act, the BC EAO reviewed the Project Description and concluded that the Project requires an Environmental Assessment. Commencing in the spring of 2014, IDM commenced environmental baseline sampling and hydrological studies, additional project engineering, as well as First Nation and stakeholder engagement. This work is being done in preparation for the filing of a Project Application report in late 2015. The filing of the report will initiate the 180-day legislated maximum time limit for review. The Company notes that Seabridge Gold (KSM Project), Pretvium Resources (Brucejack), and Alloycorp (Kitsault Moly) have all received Provincial permits and signed impact-benefit Agreements with the Nisga'a First Nation since 2014.

In support of the application and in preparation for potential feasibility assessment of project engineering, key areas of the project development plan will be assessed through the summer and fall of 2015. This will specifically include: access road engineering, project metallurgy, tailings disposal and design and water management design.

Finally, management continues to advance discussions with a number of respected banking and mining finance firms in preparation for securing the debt and equity capital required to potentially build Red Mountain in 2016.

ANNUAL GENERAL MEETING

The Company announces that it will be holding an Annual General Meeting ("Meeting") on Tuesday, the 30th day of June, 2015 at 10:00am (Vancouver time). The Meeting will be held on the 10th Floor at 595 Howe Street in Vancouver, British Columbia.

The Information Circular (to be mailed on or about June 3, 2015) will provide additional information relating to the matters to be dealt with at the Meeting. Only holders of common shares of record at the close of business on May 29, 2015 will be entitled to receive notice of and to vote at the Meeting.

ABOUT RED MOUNTAIN

IDM Mining is currently earning an option to acquire a 100% interest in the 17,125 hectare Red Mountain property, located 15 kilometers northeast of Stewart, BC. Numerous precious and base metal targets have been identified by IDM and previous operators over a 15 km by 4 km trend of strong alteration and mineralized prospects. Since discovery in 1989, in excess of $40 million has been spent on the Project including a production sized underground ramp.

QA/QC

Technical work at Red Mountain including rigorous Quality Control/Quality Assurance programs, are overseen by Rob McLeod, P.Geo, President and CEO of IDM Mining, and a Qualified Person as defined by NI 43-101. Mr. McLeod prepared and approved the technical information contained within this release.

ABOUT IDM MINING LTD.

IDM Mining Ltd. is a mineral exploration company (IDM.TO) based in Vancouver, BC, Canada. The Company's current exploration activities are focused on precious metals in British Columbia. Further information can be found on the Company's website at www.IDMmining.com.

ON BEHALF OF THE BOARD

of IDM Mining Ltd.

Robert McLeod, President, CEO and Director

Forward-Looking Statements: Some statements in this news release contain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements include, among others, statements with respect to proposed exploration and development activities and their timing, resource estimates and potential mineralization, the PEA, including estimates of capital and sustaining costs, anticipated internal rates of return, mine production, estimated recoveries, mine life, estimated payback period and net present values, opportunities to enhance the value of the Red Mountain Project and other plans and objectives of IDM. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include, among others and in addition to those described elsewhere in this release, delays in obtaining or inability to obtain required government or other regulatory approvals, permits or financing, the risk of unexpected variations in mineral resources, grade or recovery rates, of failure of plant, equipment or processes to operate as anticipated, of accidents, labor disputes, and unanticipated delays in completing other development activities, the risk that estimated costs will be higher than anticipated and the risk that the proposed mine plan and recoveries will not be achieved, equipment breakdowns and bad weather, the timing and success of future exploration and development activities, exploration and development risks, mineral resources are not as estimated, title matters, third party consents, operating hazards, metal prices, political and economic factors, competitive factors and general economic conditions. In making the forward-looking statements, the Company has applied several material assumptions including, but not limited to, the assumptions that: required approvals, permits and financing will be obtained; the proposed exploration and development will proceed as planned; with respect to mineral resource estimates, the key assumptions and parameters on which such estimates are based; that the proposed mine plan and recoveries will be achieved, that capital costs and sustaining costs will be as estimated, and that no unforeseen accident, fire, ground instability, flooding, labor disruption, equipment failure, metallurgical, environmental or other events that could delay or increase the cost of development will occur, and market fundamentals will result in sustained metals and minerals prices. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.