Advertisement
Canada markets close in 2 hours 41 minutes
  • S&P/TSX

    21,844.59
    -29.13 (-0.13%)
     
  • S&P 500

    5,031.20
    -40.43 (-0.80%)
     
  • DOW

    38,004.73
    -456.19 (-1.19%)
     
  • CAD/USD

    0.7311
    +0.0014 (+0.19%)
     
  • CRUDE OIL

    82.57
    -0.24 (-0.29%)
     
  • Bitcoin CAD

    88,201.87
    -550.71 (-0.62%)
     
  • CMC Crypto 200

    1,393.89
    +11.32 (+0.82%)
     
  • GOLD FUTURES

    2,340.50
    +2.10 (+0.09%)
     
  • RUSSELL 2000

    1,975.45
    -19.97 (-1.00%)
     
  • 10-Yr Bond

    4.7020
    +0.0500 (+1.07%)
     
  • NASDAQ

    15,538.58
    -174.16 (-1.11%)
     
  • VOLATILITY

    16.32
    +0.35 (+2.19%)
     
  • FTSE

    8,078.86
    +38.48 (+0.48%)
     
  • NIKKEI 225

    37,628.48
    -831.60 (-2.16%)
     
  • CAD/EUR

    0.6808
    -0.0011 (-0.16%)
     

Intrepid Mines Limited: Kitumba Technical Report Filed

BRISBANE, AUSTRALIA--(Marketwired - Oct. 9, 2014) - Intrepid Mines Limited (IAU.AX) ("Intrepid" or the "Company") announces that a report entitled "Kitumba Copper Project Optimised Pre-Feasibility Study NI43-101 Technical Report" dated 25 September 2014, has been filed on SEDAR (www.sedar.com) and on the ASX platform, following the announcement on 28 August 2014, of the proposed merger between Intrepid and Blackthorn Resources Limited ("Blackthorn"). The report was prepared by independent consultants Lycopodium Minerals Pty Limited, in accordance with Canadian National Instrument 43-101 and the JORC Code.

The Kitumba Project ("Kitumba"), situated in west-central Zambia, is Blackthorn's flagship project. An Optimised Pre-Feasibility Study on Kitumba was completed by Blackthorn in April 2014, and the technical report relates to this study. Should the proposed merger complete as anticipated, Kitumba will be the merged entity's cornerstone project and management will progress a Definitive Feasibility Study as a priority.