Intrepid Mines Limited: Kitumba Drilling Results at Mumbwa Project
SYDNEY, AUSTRALIA--(Marketwired - April 9, 2015) - Intrepid Mines Limited (IAU.AX) ("Intrepid" or the "Company") advises that assay results from Phase 8 drilling conducted at the Kitumba prospect within the Mumbwa Project in west-central Zambia, have returned encouraging results.
Final drilling assay results have been received, including 13 diamond holes and 8 reverse circulation holes. The key results to note include:
Highlights from infill drilling at Kitumba:
KITDD_041A: 42 metres @ 2.21% copper from 252-294 metres
KITDD_052: 22 metres @ 1.68% copper from 356-378 metres
KITDD_053: 64 metres @ 1.55% copper from 226-290 metres
KITDD_054: 26 metres @ 1.52% copper from 378-404 metres
Highlights from geotechnical and sterilisation drilling:
KITDD_060: 12 metres @ 1.31% copper from 333-345 metres
KITDD_062: 7 metres @ 1.48% copper from 344-351 metres
KITDD_068: 39 metres @ 0.75% copper from 380-419 metres
Highlights from drilling at Kitumba east:
KITDD_070: 20 metres @ 0.97% copper from 289-309 metres
Highlights from RC drilling on new exploration targets:
o 7 metres at 0.71% copper from 43-50 metres, with a peak assay of 1 metre @ 0.98% copper from 46-47 metres
The Company's CEO, Scott Lowe said:
"We are pleased to provide the final assay results from the Phase 8 drilling program, as well as the results from some RC drilling on targets outside of Kitumba. We are particularly encouraged by the copper results returned from the RC drilling on Target H.
The Company recognizes that the current copper market is very challenging for new projects, and the next phase of operations will include work aimed at enhancing Kitumba economics. The objective of this work will be to deliver a project capable of attractive returns at lower copper prices and will involve a range of initiatives including drilling nearby satellite targets. We look forward to following up on Target H and other targets in the next drilling season, which will get underway immediately following the end of the wet season, expected to be around mid-April.
Feasibility work will continue to be staged to take account of economics and will incorporate these Phase 8 drill results along with 2015 drilling results and the outcome of value enhancement efforts. A revised Mineral Resource and Reserve estimate will form part of the future feasibility work."
The Company has received assay results for the following drill holes from the Phase 8 drilling program at Kitumba:
KITDD_041A
KITDD_052
KITDD_053
KITDD_054
KITDD_056
KITDD_057
KITDD_058
KITDD_059
KITDD_060
KITDD_062
KITDD_068
KITDD_069
KITDD_070
The location of these drill holes is shown in Figure 1.
Figure 1: Phase 8 Kitumba area drill hole location plan, showing collar locations and planned development as presented in the Optimised PFS: http://media3.marketwire.com/docs/1001031-F1.pdf
Assay results for RC drilling of areas slated for infrastructure (sterilisation drilling) and on IP targets have been received for the following holes and are shown on Figure 2:
KITRC_003
KITRC_004
KITRC_005
KITRC_006
HRC_002
KAKRC_002
KAKDD_004
KAKDD_006
Figure 2. RC and sterilisation drill hole location plan showing collar locations and company tenure on hill shaded elevation model: http://media3.marketwire.com/docs/1001031-F2.pdf
Phase 8 Drilling Program
Drilling restarted at Kitumba in June 2014 and was completed in November 2014. A total of 33 diamond holes were completed for a total of 12,849 metres. The drill program was specifically designed to aid in further feasibility studies for both the proposed mine and process plant design. The drilling was targeting additional resource definition, the collection of further metallurgical samples, and geotechnical and hydrogeological assessment.
Table 1. Completed Phase 8 drill holes
ID | East | North | Z | Azi | Dip | EOH | Comment |
KAKDD_004 | 474960 | 8375409 | 1,267 | 90 | -70 | 548 | Sterilisation |
KAKDD_005 | 476000 | 8375000 | 1,278 | 90 | -60 | 550 | Sterilisation |
KAKDD_006 | 476247 | 8374300 | 1,272 | 90 | -57 | 341 | Sterilisation |
KITDD_041A | 479091 | 8373991 | 1,405 | 90 | -75 | 599 | Infill |
KITDD_042A | 479092 | 8373797 | 1,417 | 90 | -70 | 539 | Infill |
KITDD_043 | 479044 | 8373908 | 1,409 | 90 | -78 | 468 | Infill |
KITDD_044 | 479160 | 8373797 | 1,431 | 90 | -70 | 459 | Infill |
KITDD_045 | 479189 | 8373921 | 1,408 | 90 | -75 | 543 | Infill |
KITDD_046 | 479160 | 8373950 | 1,409 | 90 | -70 | 455 | Infill |
KITDD_047 | 479212 | 8374067 | 1,420 | 90 | -66 | 358 | Infill |
KITDD_048 | 479200 | 8373742 | 1,447 | 0 | -90 | 542 | Infill |
KITDD_049 | 479217 | 8374017 | 1,427 | 90 | -70 | 500 | Infill |
KITDD_050 | 479087 | 8373702 | 1,424 | 90 | -70 | 468 | Infill |
KITDD_051 | 479215 | 8374098 | 1,424 | 85 | -70 | 423 | Infill |
KITDD_052 | 479140 | 8374113 | 1,415 | 90 | -70 | 444 | Infill |
KITDD_053 | 479172 | 8374024 | 1,415 | 0 | -90 | 497 | Infill |
KITDD_054 | 479127 | 8374068 | 1,410 | 90 | -70 | 551 | Infill |
KITDD_055 | 479256 | 8373862 | 1,450 | 0 | -90 | 603 | Infill |
KITDD_056 | 478777 | 8373870 | 1,386 | 0 | -90 | 196 | Shaft |
KITDD_057 | 478777 | 8373921 | 1,384 | 0 | -90 | 196 | Shaft |
KITDD_058 | 478777 | 8374034 | 1,396 | 0 | -90 | 329 | Shaft |
KITDD_059 | 478777 | 8374284 | 1,389 | 0 | -90 | 214 | Shaft |
KITDD_060 | 478905 | 8374127 | 1,408 | 115 | -70 | 522 | Decline |
KITDD_061 | 478572 | 8373954 | 1,380 | 239 | -70 | 141 | Decline |
KITDD_062 | 478902 | 8373946 | 1,393 | 115 | -70 | 500 | Decline |
KITDD_063 | 478363 | 8373829 | 1,359 | 0 | -90 | 85 | Decline |
KITDD_064 | 478167 | 8373714 | 1,373 | 59 | -70 | 71 | Decline |
KITDD_065 | 478090 | 8373664 | 1,378 | 239 | -70 | 61 | Decline |
KITDD_066 | 477998 | 8373604 | 1,379 | 239 | -70 | 46 | Decline |
KITDD_067 | 479275 | 8374000 | 1,439 | 88 | -65 | 402 | Kitumba east |
KITDD_068 | 478690 | 8374000 | 1,387 | 87 | -55 | 539 | Kitumba west |
KITDD_069 | 478800 | 8373910 | 1,390 | 90 | -70 | 249 | Kitumba west |
KITDD_070 | 479300 | 8373900 | 1,433 | 88 | -65 | 414 | Kitumba east |
12,853 |
The collection of material for metallurgical analysis included samples representative of ore-feed (and gangue) from a conceptual mining schedule, comminution samples and feed for a pilot plant. Initial assay results were reported to the ASX in December 2014. Metallurgical holes were also designed to fill gaps in the existing resource and to inform a future update of the Mineral Resource Estimate. Select metallurgical/infill holes were also used for geotechnical and hydrological purposes.
Drilling that was specifically designed for geotechnical purposes only was also completed (no mineralisation expected: KITDD_061, KITDD_063, KITDD_064, KITDD_065 and KITDD_066 were not assayed). These holes were drilled into areas of planned development (boxcut, decline, air shafts). Geotechnical holes have been probed with an Acoustic Televiewer ("ATV") for the collection of detailed-high resolution structural and engineering data. Geotechnical samples for laboratory analysis have been collected and planned test work includes: unconfined compressive strength, direct shear, triaxial, Cerchar abrasivity index, slake durability and petrographic analysis.
Drilling Outside of Kitumba
Additional drilling outside the Kitumba resource included a fence of three RC holes on Target F, two RC holes on Target H and sterilisation drilling on areas slated for planned infrastructure (Table 2).
Figure 3: Mumbwa Project targets: http://media3.marketwire.com/docs/1001031-F3.pdf
Table 2. RC drilling
ID | East | North | z | Azi | Dip | EOH | Comments |
(m) | |||||||
HRC_001 | 484935 | 8369628 | 1,332 | 310 | 60 | 300 | Target H, not assayed |
HRC_002 | 485555 | 8369135 | 1,307 | 310 | 60 | 94 | Target H, hole Failed |
KAKRC_001 | 474769 | 8374771 | 1,268 | 110 | 60 | 300 | Target F, not assayed |
KAKRC_002 | 475008 | 8374694 | 1,279 | 110 | 60 | 246 | Target F |
KAKRC_003 | 475251 | 8374591 | 1,295 | 110 | 60 | 288 | Target F, not assayed |
KITRC_003 | 477444 | 8372609 | 1,282 | 50 | 60 | 300 | Sterilisation (planned camp) |
KITRC_004 | 476859 | 8373314 | 1,275 | 50 | 60 | 300 | Sterilisation (planned plant) |
KITRC_005 | 477534 | 8373710 | 1,349 | 50 | 60 | 300 | Sterilisation (planned waste rock dump) |
KITRC_006 | 477943 | 837519 | 1,300 | 270 | 60 | 276 | Sterilisation (planned water storage facility) |
"Target H" RC Drilling - Assay Results
RC drilling in the Target H IP survey area was focused on a conductivity anomaly for HRC_001 and a coincident chargeability anomaly, conductivity lineament and copper in soils anomaly situated on an iron-breccia cap for HRC_002 (Table 2 and Figure 2). The holes were drilled at 60 degrees to crosscut key structural and stratigraphic boundaries. Samples were collected from intercepts identified as mineralised in logging and using a portable field XRF.
A total of 99 samples were collected for HRC_002, including quality control samples and were submitted to the laboratory for analysis. An oxidised zone of 7 metres at 0.71% copper ("Cu") from 43-50 metres, with a peak assay of 1 metre @ 0.98% Cu from 46-47 metres was returned. HRC_002 failed at 94 metres in leached and weathered material. Deep leaching is seen at Kitumba in response to the Kitumba fault zone, hydrothermal alteration and the acid generation capacity of sulphide material.
Given these encouraging results, a diamond tail will be drilled on HRC_002 following the end of the wet season (in the second quarter of 2015). HRC_001 was un-mineralised and not sampled.
Final results having passed QA/QC are summarised here.
Table 3. Summary of assay results for HRC_002.
From | To | Interval | Cu % |
34 | 52 | 18 | 0.48 |
Including | |||
43 | 50 | 7 | 0.71 |
86 | 89 | 3 | 0.36 |
"KIT" RC Drilling - Assay Results
RC drilling in the Kitumba area was focused on sterilisation drilling in areas of planned infrastructure (Table 2 and Figure 2). Samples were collected from intercepts identified as mineralised in logging and using a portable field XRF. Holes were drilled at 60 degrees to crosscut key structural and stratigraphic boundaries.
13 samples were collected for KITRC_003, 13 for KITRC_004, 211 for KITRC_005 and 138 for KITRC_006. These samples (including quality control samples), were submitted to the laboratory for analysis. Assays of note were only returned from KITRC_005. The best intercept from KITRC_005 was 4 metres @ 0.66% Cu from 202-206 metres.
Final results having passed QA/QC are summarised here.
Table 4. Summary of assay results for KITRC_005.
From | To | Interval | Cu % |
149 | 159 | 10 | 0.45 |
171 | 177 | 6 | 0.48 |
201 | 207 | 6 | 0.56 |
Including | |||
202 | 206 | 4 | 0.66 |
"Target F" RC Drilling - Assay Results
RC drilling in the southern part of the Kakozhi IP survey area was focused on "Target F", a zone of high chargeability coincident with a copper in soils anomaly (Table 2 and Figure 2). Holes were drilled at 60 degrees to crosscut key structural and stratigraphic boundaries. Samples were collected from intercepts identified as mineralised in logging and using a portable field XRF.
43 samples were collected for KAKRC_002, including quality control samples and were submitted to the laboratory for analysis. The peak assay returned was 1 metre @ 0.54% Cu from 148-149 metres. The IP and copper in soils anomaly at Target F has been interpreted as occurring on the contact between a Hook intrusive and the older Kundelungu metasediments. No samples were collected from KAKRC_001 and KAKRC_003. No further work is recommended.
Final results having passed QA/QC are summarised here.
Table 5. Summary of assay results for KAKRC_002.
From | To | Interval | Cu % |
146 | 149 | 3 | 0.30 |
Kitumba Infill Drilling
KITDD_041A - Assay Results
KITDD_041A was drilled on an azimuth of 090, inclined 75 degrees to a depth of 599 metres. This hole was drilled to collect metallurgical samples as well as for resource definition. Intercepts of note include 42 metres @ 2.21% Cu from 252-294 metres.
A series of 537 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 6. Summary of assay results for drill hole KITDD_041A (azi 090, dip 75, EOH 599 m)
From | To | Interval | Cu % |
2 | 38 | 36 | 0.33 |
52 | 56 | 4 | 0.34 |
68 | 106 | 38 | 0.34 |
136 | 146 | 10 | 0.31 |
172 | 182 | 10 | 0.40 |
225 | 300 | 75 | 1.40 |
Including | |||
252 | 294 | 42 | 2.21 |
313 | 334 | 21 | 0.81 |
353 | 399 | 46 | 0.64 |
403 | 409 | 6 | 0.46 |
414 | 423 | 9 | 0.34 |
426 | 502 | 76 | 0.74 |
527 | 530 | 3 | 0.27 |
548 | 552 | 4 | 0.86 |
KITDD_052 - Assay Results
KITDD_052 was drilled on an azimuth of 90, inclined 70 degrees to a depth of 444 metres. This hole was drilled to collect metallurgical samples as well as for resource definition in the northern extent of the ore body. Intercepts of note include 22 metres @ 1.68% Cu from 356-378 metres.
A series of 367 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 7. Summary of assay results for drill hole KITDD_052 (azi 090, dip 70, EOH 444m)
From | To | Interval | Cu % |
60 | 70 | 10 | 0.31 |
74 | 78 | 4 | 0.28 |
94 | 100 | 6 | 0.25 |
112 | 237 | 125 | 0.51 |
240 | 252 | 12 | 0.30 |
261 | 265 | 4 | 0.27 |
275 | 338 | 63 | 0.87 |
Including | |||
281 | 293 | 12 | 2.15 |
349 | 353 | 4 | 0.38 |
356 | 404 | 48 | 1.02 |
Including | |||
356 | 378 | 22 | 1.68 |
414 | 420 | 6 | 0.46 |
426 | 430 | 4 | 0.69 |
KITDD_053 - Assay Results
KITDD_053 was drilled vertically to a depth of 497 metres. This hole was drilled to collect metallurgical samples as well as for resource definition. Intercepts of note include 64 metres @ 1.55% Cu from 226-290 metres.
A series of 420 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 8. Summary of assay results for drill hole KITDD_053 (vertical, EOH 497 m)
From | To | Interval | Cu % |
50 | 200 | 150 | 0.35 |
205 | 209 | 4 | 0.33 |
212 | 218 | 6 | 0.33 |
226 | 290 | 64 | 1.55 |
298 | 320 | 22 | 0.94 |
325 | 343 | 18 | 0.94 |
350 | 359 | 9 | 0.93 |
364 | 371 | 7 | 0.37 |
415 | 439 | 24 | 0.75 |
444 | 448 | 4 | 0.43 |
451 | 456 | 5 | 1.28 |
469 | 479 | 10 | 0.99 |
KITDD_054 - Assay Results
KITDD_054 was drilled on an azimuth of 090, inclined 70 degrees to a depth of 551 meters. This hole was drilled to collect metallurgical samples as well as for resource definition in the northern end of the deposit. Intercepts of note include 26 metres @ 1.52% Cu from 378-404 metres.
A series of 469 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 9. Summary of assay results for drill hole KITDD_054 (azi 090, dip 70, EOH 551m)
From | To | Interval | Cu % |
102 | 118 | 16 | 0.25 |
126 | 150 | 24 | 0.31 |
158 | 287 | 129 | 0.83 |
294 | 305 | 11 | 0.46 |
332 | 338 | 6 | 0.47 |
345 | 408 | 63 | 0.92 |
Including | |||
378 | 404 | 26 | 1.52 |
412 | 418 | 6 | 0.80 |
444 | 454 | 10 | 0.32 |
457 | 530 | 73 | 0.79 |
Kitumba West drilling
KITDD_068 - Assay Results
KITDD_068 was drilled on an azimuth of 087, inclined 55 degrees to a depth of 539 metres. This hole was drilled targeting an IP chargeability anomaly and following up low-moderate grade mineralisation in KITDD_015. Intercepts of note include 39 metres @ 0.75% Cu from 380-419 metres.
A series of 403 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 10. Summary of assay results for drill hole KITDD_068 (azi 087, dip 55 EOH 539 m)
From | To | Interval | Cu % |
32 | 36 | 4 | 0.29 |
60 | 66 | 6 | 0.51 |
176 | 186 | 10 | 0.46 |
300 | 304 | 4 | 0.98 |
321 | 345 | 24 | 0.71 |
358 | 364 | 6 | 0.38 |
369 | 421 | 52 | 0.64 |
Including | |||
380 | 419 | 39 | 0.75 |
435 | 440 | 5 | 0.33 |
444 | 446 | 2 | 1.10 |
450 | 461 | 11 | 0.41 |
473 | 483 | 10 | 0.33 |
KITDD_069 - Assay Results
KITDD_069 was drilled on an azimuth of 090, inclined 70 degrees to a depth of 249 metres. This hole was drilled to follow up shallow hypogene (sulphide) mineralisation intersected in KITDD_015 and KITDD_057. A shallow zone of sulphides was intersected including an assay of 1 metre @ 1.15% from 57-58 metres within a low- grade zone of 44 metres at 0.32% Cu from 40-84 metres.
A series of 145 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 11. Summary of assay results for drill hole KITDD_069 (azi 090, dip 70 EOH 249 m)
From | To | Interval | Cu % |
40 | 84 | 44 | 0.32 |
Kitumba East drilling
KITDD_070 - Assay Results
KITDD_070 was drilled on an azimuth of 088, inclined 65 degrees to a depth of 414 metres. This hole was drilled targeting the southern extension of the "Kitumba East" zone, a hematite breccia situated to the east of the Kitumba Fault Zone (the main ore body is located on the western side) previously intersected in KITDD_036. The hole successfully intersected "Kitumba East" in multiple zones, however grades are below ore grade. Best intercepts include 20 metres @ 0.97% Cu from 289-309 metres. KITDD_067 was drilled targeting the interpreted northern extension of Kitumba East, however was un-mineralised and not sampled.
A series of 209 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 12. Summary of assay results for drill hole KITDD_070 (azi 088, dip 65 EOH 414 m)
From | To | Interval | Cu % |
214 | 230 | 16 | 0.29 |
240 | 284 | 44 | 0.47 |
289 | 309 | 20 | 0.97 |
364 | 373 | 9 | 0.67 |
377 | 396 | 19 | 0.68 |
Geotechnical drilling
KITDD_056 - Assay Results
KITDD_056 was drilled vertically to a depth of 196 metres. This hole was drilled for geotechnical information on the planned position of a ventilation shaft. No assays of note were returned.
A series of 110 samples, including quality control samples, were submitted to the laboratory for analysis.
KITDD_057 - Assay Results
KITDD_057 was drilled vertically to a depth of 196 metres. This hole was drilled for geotechnical information on the planned position of a ventilation shaft.
A series of 131 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 13. Summary of assay results for drill hole KITDD_057
(vertical, EOH 196 m)
From | To | Interval | Cu % |
32 | 63 | 31 | 0.47 |
80 | 84 | 4 | 0.41 |
90 | 94 | 4 | 0.32 |
KITDD_058 - Assay Results
KITDD_058 was drilled vertically to a depth of 329 metres. This hole was drilled for geotechnical information on the planned position of a ventilation shaft.
A series of 197 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 14. Summary of assay results for drill hole KITDD_058
(vertical, EOH 329 m)
From | To | Interval | Cu % |
218 | 223 | 5 | 0.72 |
235 | 242 | 7 | 0.58 |
KITDD_059 - Assay Results
KITDD_059 was drilled vertically to a depth of 214 metres. This hole was drilled for geotechnical information on the planned position of a ventilation shaft.
A series of 140 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 15. Summary of assay results for drill hole KITDD_059
(vertical, EOH 214 m)
From | To | Interval | Cu % |
26 | 36 | 10 | 0.35 |
54 | 60 | 6 | 0.31 |
77 | 82 | 5 | 0.56 |
139 | 144 | 5 | 1.30 |
184 | 188 | 4 | 0.25 |
KITDD_060 - Assay Results
KITDD_060 was drilled on an azimuth of 115, inclined 70 degrees to a depth of 522 metres. This hole was drilled on the planned position of the decline. Narrow zones of mineralisation including 12 metres @ 1.31% Cu from 333-345 metres.
A series of 402 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 16. Summary of assay results for drill hole KITDD_060 (azi 115, dip 70 EOH 522 m)
From | To | Interval | Cu % |
108 | 126 | 18 | 0.32 |
130 | 134 | 4 | 0.33 |
218 | 224 | 6 | 0.28 |
234 | 254 | 20 | 0.27 |
261 | 264 | 3 | 0.37 |
268 | 270 | 2 | 0.87 |
294 | 307 | 13 | 0.44 |
312 | 317 | 5 | 0.38 |
322 | 345 | 23 | 0.94 |
Including | |||
333 | 345 | 12 | 1.31 |
370 | 379 | 9 | 0.35 |
386 | 391 | 5 | 0.33 |
395 | 401 | 6 | 0.56 |
404 | 409 | 5 | 0.40 |
414 | 423 | 9 | 0.75 |
440 | 453 | 13 | 0.35 |
467 | 473 | 6 | 0.87 |
KITDD_062 - Assay Results
KITDD_062 was drilled on an azimuth of 115, inclined 70 degrees to a depth of 500 metres. This hole was drilled on the planned position of the decline. Narrow zones of mineralisation (outside of the mine design) including 7 metres @ 1.48% Cu from 344-351 metres.
A series of 311 samples, including quality control samples, were submitted to the laboratory for analysis.
Final results having passed QA/QC are summarised here.
Table 17. Summary of assay results for drill hole KITDD_062 (azi 115, dip 70 EOH 500 m)
From | To | Interval | Cu % |
10 | 20 | 10 | 0.32 |
152 | 156 | 4 | 0.33 |
178 | 190 | 12 | 0.46 |
198 | 208 | 10 | 0.44 |
226 | 230 | 4 | 0.39 |
274 | 309 | 35 | 0.37 |
324 | 336 | 12 | 0.39 |
342 | 352 | 10 | 1.15 |
Including | |||
344 | 351 | 7 | 1.48 |
354 | 380 | 26 | 0.41 |
392 | 428 | 36 | 0.33 |
444 | 450 | 6 | 0.40 |
Notes:
Sampling and assaying of the drill core and RC chips collected follows a standard site protocol with samples being submitted to the Intertek Genalysis Laboratory preparation facility in Chingola, Zambia before being shipped to the Intertek Genalysis Laboratory in Perth, Australia for analysis (4-acid digest with an ICP finish).
A cut-off grade of 0.25% copper, a maximum internal dilution of 2 metres (drilled thickness) and a drilled thickness of >2 metres are used as a guideline when delineating the drilled thickness intervals of mineralisation, with length-weighted average grades reported. True-widths are not quoted, as the mineralised zone is associated with a sub-vertical "pipe" shaped zone of brecciation. No upper limit has been applied to copper grades in these exploration results.
A total of 8 elements were analysed. Multi-element analyses (including copper) were performed using Inductively Coupled Plasma - Mass Spectrometry (ICP-MS) and Inductively Coupled Plasma - Optical Emission Spectroscopy (ICP-OES) analyses by the fully NATA accredited Intertek Genalysis Laboratory in Perth, Australia. Samples were analysed for total copper and Ca, Fe, K, Mn and S by 4-acid digest with an ICP-OES finish, U by 4-acid digest with an ICP-MS finish, and acid-soluble copper (ASCu) by cold acid leach with an AAS finish.
A Quality Assurance/Quality Control ("QA/QC") program includes chain of custody protocol, a systematic submittal of 20% QA/QC samples including field duplicates, field blanks and certified reference samples into the flow of samples submitted to the laboratory and submission of samples for umpire analysis by a second accredited laboratory.
ATTRIBUTION | The information in this report which relates to exploration results at the Mumbwa Project in Zambia is based on information compiled by Mr Michael J Robertson, MSc, Pr.Sci.Nat., MSAIMM who is a member of the South African Institute of Mining and Metallurgy, which is a Recognised Professional Organisation ('RPO'). Mr Robertson has more than 22 years' experience in mineral exploration and is a full- time employee of The MSA Group. Mr Robertson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' and a Qualified Person as defined in the Canadian National Instrument 43-101 (Standards of Disclosure for Mineral Projects). Mr Robertson has consented to the inclusion in this report of the matters based on his information in the form and context in which it appears. |
Forward-looking statements
This announcement contains certain forward-looking statements relating to, but not limited to Intrepid's expectations, intentions, plans and beliefs. Forward-looking information can often be identified by forward-looking words such as 'anticipate', 'believe', 'expect', 'goal', 'plan', 'intend', 'estimate', 'may' and 'will' or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future outcomes, or statements about future events or performance. Forward-looking information may include reserve and resource estimates, estimates of future production, unit costs, costs of capital projects, and timing of commencement of operations and is based on current expectations that involve a number of business risks and uncertainties. Factors that could cause actual results to differ materially from any forward-looking statement include, but are not limited to, failure to establish estimated resources and reserves, the grade and recovery of ore which is mined varying from estimates, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and other factors. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from those expressed or implied.
Shareholders and potential investors are cautioned not to place undue reliance on forward-looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. Intrepid undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.
Appendix1: JORC Code, 2012 Edition |
Section 1 Sampling Techniques and Data |
(Criteria in this section apply to all succeeding sections.) |
Criteria | JORC Code explanation | Commentary | ||
Sampling | - Nature and quality of sampling (eg, cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling. |
| - A total of 33 diamond drill holes were drilled in phase 8 for a total of 12,853m. 13 are presented here. Holes were drilled at various inclinations from vertical through to 55 degrees, predominantly angled towards 090 at between 60 and 115 degrees. Geotechnical drill holes on the proposed decline position were drilled at 239 degrees. 9 RC holes were drilled in phase 8 for a total of 2404m. Assay results for 6 of these are presented here. RC holes were drilled on an inclination of 60 degrees to cross cut zones of structural and stratigraphic interest. | |
Drilling | - Drill type (eg, core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc). | - Diamond core was, HQ predominant with PQ pre-collars. Core was oriented using a Reflex ACT II. Reverse Circulation was used on sterilisation holes and targets outside Kitumba. | ||
Drill | - Method of recording and assessing core and chip sample recoveries and results assessed. | - Core recoveries are logged, core recoveries for phases 1-7 were 96%. | ||
Logging | - Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. | - All core and chip samples have been logged for geological (lithology, mineralisation, alteration) and geotechnical (alpha/beta angles, RQD, defect count) information, all data is stored in a database. | ||
Sub-sampling | - If core, whether cut or sawn and whether quarter, half or all core taken. | - All core is cut with purpose built core saws onsite, with half core (HQ and NQ size) collected for sampling, ensuring the same side of the core is consistently sampled. In the case of PQ size core, quarter core was cut and sampled. Field duplicates were submitted to monitor QC of sample preparation and laboratory assay precision. | ||
Quality | - The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. | - Samples were submitted to a four acid digest (sulphuric, nitric, perchloric and hydrofluoric) and cold acid leach. | ||
Verification | - The verification of significant intersections by either independent or alternative company personnel. | - Significant intersections are reported by The MSA Group which is an independent contractor providing geological services to the company. | ||
Location of | - Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. | - Hole collars have been surveyed by differential GPS, down hole surveys were collected every 6m (inclined holes) and 12m (vertical holes) using Reflex and Gyro instruments during different phases of the project. Appropriate QC procedures were applied to verify down hole surveys. | ||
Data | - Data spacing for reporting of Exploration Results. | - The nominal drill hole spacing varies between 20m and 40m in the high grade portion to between approximately 80m and 200m outside of this extending out to 200m x 200m on the margins. | ||
Orientation | - Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. | - Holes are predominantly drilled towards 090 at a 60-80 degrees dip to intersect sub vertical N-S oriented mineralisation. Holes have been drilled towards 180 and 270 confirming the sub-vertical nature of the deposit. | ||
Sample | - The measures taken to ensure sample security. | - An unbroken sample chain of custody was implemented, as follows: | ||
Audits or | - The results of any audits or reviews of sampling techniques and data.esults of any audits or reviews of sampling techniques and data. | - Audits of the sample preparation laboratories at AH Knight in Kitwe and Intertek Genalysis in Chingola and an audit of the Intertek Genalysis Laboratory in Johannesburg were conducted by the CP. |
Section 2 Reporting of Exploration Results |
(Criteria listed in the preceding section also apply to this section.) |
Criteria | JORC Code explanation | Commentary | ||
Mineral | - Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. | - Kitumba, Target F and Target H are located entirely within the 100% owned Kitumba Mining licence 19820-HQ-LML. | ||
Exploration | - Acknowledgment and appraisal of exploration by other parties. | - The Mumbwa Project operated under joint venture with BHP Billiton from 2008-2011. | ||
Geology | - Deposit type, geological setting and style of mineralization. | - The Kitumba deposit is recognised as having IOCG type characteristics; it is hosted in a hematite breccia complex within intrusives of the Hook Granitoid suite (Early Cambrian to Neoproterozoic). Mineralisation is supergene in nature (chalcocite, malachite, chalcosiderite, native copper) to 400+m, hypogene mineralisation consists primarily of chalcopyrite and pyrite. | ||
Drill hole | - A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: | - See Table 1. | ||
Data | - In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg, cutting of high grades) and cut-off grades are usually Material and should be stated. | - Length-weighted average grades reported. No upper limit has been applied to copper grades in these exploration results. | ||
Relationship | - These relationships are particularly important in the reporting of Exploration Results. | - True-widths are not quoted, as the mineralised zone is associated with a sub-vertical north-south oriented zone of brecciation. | ||
Diagrams | - Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. | - A plan map (Figure 1), is contained within this announcement. | ||
Balanced | - Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. | - All results are reported. | ||
Other | - Other exploration data, if meaningful and material, should be reported including (but not limited to): geological | - There is no outstanding exploration data considered material that has not been previously reported or is not | ||
Further | - The nature and scale of planned further work (eg, tests for lateral extensions or depth extensions or large-scale step-out drilling). | - Future drilling at Kitumba will focus on sample collection for metallurgy, sterilisation and geotechnical drilling to satisfy requirements for a "DFS" and project development. Exploration work will concentrate on satellite prospects surrounding Kitumba within the Mumbwa Project area. |