TORONTO, CANADA--(Marketwire - Aug. 3, 2012) - Gabriel Resources Ltd. (TSX:GBU.TO - News) ("Gabriel" or the "Company") announces the publication of its Second Quarter Financial Statements and Management's Discussion and Analysis Report for the period ended June 30, 2012. 

Summary

--  The political landscape in Romania changed significantly on April 27,
    2012 when the Romanian Government at the time, an alliance formed
    primarily between the Liberal Democratic Party ("PDL") and a Hungarian-
    ethnic party alliance ("UDMR"), lost a vote of no confidence. This vote
    led to the appointment on May 7, 2012 of a new Prime Minister, Mr.
    Victor Ponta, who is the third to have served Romania in this role in
    the last six months (a fourth served as interim PM for less than 24
    hours). Mr. Ponta is President of the Social Democrat Party ("PSD") and
    leads a "USL" coalition government, predominantly formed by the PSD and
    the Liberal Party ("PNL").  
    
--  The new Romanian Government has stated that it will re-analyze the Rosia
    Montana Project ("Project") in a transparent manner and based on an open
    and democratic dialogue, so that the decisions are in accordance with
    the national interest, environmental protection and European
    legislation. 
    
--  Since its appointment in May 2012, the new Government has stated that it
    will not make any key decisions on the Project until after the national
    elections, currently anticipated to be held in November 2012. 

--  Permitting for the Project remains the core focus of the Company,
    however Gabriel is still awaiting formal confirmation from the Technical
    Analysis Committee ("TAC"), through its review of the Environmental
    Impact Assessment ("EIA"), that all technical aspects have been
    clarified to its satisfaction. 

--  The Company will seek clarification from the new Government and the TAC
    as to the next steps in its EIA review process. At this time Gabriel is
    unable to provide guidance on the time that it might take the TAC to
    vote on the EIA or to release its recommendation to the Government. 

--  Media statements by the Prime Minister and other ministers in the new
    Government since May 2012 cite key issues for resolution with the
    Company including environmental protection, publication of the Mining
    Licence, completion of the TAC/EIA process, Project ownership and
    royalty rates. To date, there has been no direct correspondence on any
    such issues. It remains the Company's firm commitment to engage in
    dialogue with the new Government in regard to any and all of its issues
    and concerns regarding the Project. 

--  The Company's 80.69% owned Romanian subsidiary, Rosia Montana Gold
    Corporation S.A. ("RMGC"), recently achieved the 16th court victory for
    the Project from 17 hearings since 2010, most notably the Romanian
    courts have confirmed that the urbanism plans currently in place for the
    Project remain legal and valid and have been since their approval in
    2002. However NGOs against the Project have continued to register new
    legal challenges in the quarter against local, regional and national
    Romanian authorities that grant licenses, permits, authorizations and
    approvals for many aspects of the Project. 

--  $100.6 million of cash and cash equivalents was held at June 30, 2012.
    The Company is currently implementing the conclusion of its review of
    all areas of expenditure with a view to reducing monthly costs
    substantially until such time as the new Government moves ahead with
    Project permitting. 

 

Jonathan Henry, Gabriel's President and Chief Executive Officer, stated:

"The timeline of permitting the Project remains uncertain, and is likely to remain so until the next general election is concluded later this year. In the interim, the Company is looking forward to having an open and transparent hearing with the respective Romanian ministries involved in the permitting of the Project in order to discuss any and all issues in relation to its successful permitting. Gabriel believes that the substantial economic, social and environmental benefits of the Project, not only for the local area around Rosia Montana but also for Romania as a whole, remain a compelling argument for positive action by the Romanian Government now and post the elections."

Further commentary on operations and results in the second quarter of 2012, together with events anticipated in the short term, is given below. The Company has filed its Condensed Consolidated Financial Statements and Management's Discussion & Analysis on SEDAR at www.sedar.com. 

About Gabriel

Gabriel is a Canadian TSX-listed resource company focused on permitting and developing its world-class Rosia Montana gold and silver project. The Project, the largest undeveloped gold deposit in Europe, is owned through Rosia Montana Gold Corporation ("RMGC"), a Romanian company in which Gabriel holds an 80.69% stake with the 19.31% balance held by CNCAF Minvest S.A., a Romanian state-owned mining enterprise. Gabriel and RMGC are committed to responsible mining and sustainable development in the communities in which they operate. The Project is anticipated to bring US$19 billion to Romania as potential direct and indirect contribution to GDP according to 2010 estimates from UK-based Oxford Policy Management (using a gold price of US$900/oz). This contribution increases to over US$30 billion at today's gold price. The Project will generate thousands of employment opportunities. Gabriel intends to build a state-of-the-art mine using best available techniques and implementing the highest environmental standards whilst preserving local and national cultural heritage in Romania. For more information please visit the Company's website at www.gabrielresources.com.

Further Information

Financial Performance

--  The net loss for the second quarter was $2.7 million, or $0.007 per
    share. 

 

Liquidity and Capital Resources

--  Cash and cash equivalents at June 30, 2012 totaled $100.6 million. 
    
--  In light of recent Euro instability, the Company is following a strategy
    of reducing Euro balances through operational expenditure in preference
    to US and Canadian dollar holdings. At June 30, 2012, Euro holdings
    represented 9% of cash and cash equivalents (March 31, 2012: 23%; June
    30, 2011: 46%).  
    
--  The Company is currently implementing the conclusions of its review of
    all areas of expenditure and is reducing monthly costs substantially
    until such time as the new Government moves ahead with Project
    permitting. 

 

Political Environment

--  On April 27, 2012 the former Government, led by then Prime Minister
    Ungureanu, lost a no confidence vote brought by the opposition resulting
    in its demise after only 11 weeks in power. The President of Romania,
    Traian Basescu, asked Mr. Victor Ponta, leader of the Romanian Social
    Democratic Party, to create a new Government and the USL coalition
    Government was voted in by Parliament on May 7, 2012. Parliamentary
    elections are expected to be scheduled for November 2012. 

--  According to polls reported in the media, the new Government enjoys
    majority public support amongst the voting public, and in local
    elections held on June 10, 2012 a turnout of approximately 58% resulted
    in the USL gaining approximately 50% of the vote and securing 36 out of
    the total of 41 County Council Presidents. Locally, the Mayor of Rosia
    Montana was re-elected for a further four year term, with support for
    the Project being a key pillar of his election campaign. 

--  On July 6, 2012 Romania's Parliament voted to suspend President Basescu
    pending a public referendum on his removal from office. The referendum,
    which was held on July 29, 2012, reportedly fell short of the 50%
    turnout threshold required for the result to be binding, despite a
    majority voting for the President's dismissal. The result of the
    referendum has yet to be approved by the Constitutional Court of
    Romania. 

--  Since the May 2012 investiture of the new Government led by Mr. Ponta,
    the local elections together with proceedings to remove the President
    from office and other political actions undertaken by the new Government
    have limited significantly the level of engagement at a ministerial
    level on the Project. A number of such actions undertaken by the
    Government in the last two months have been noted publicly as a cause
    for concern inside and outside of Romania with pronouncements from the
    EU and European governments. 

--  The Project remains a high profile issue in Romania, with wide coverage
    in television debates, on the internet and in print media, as well as
    being the subject of comment from leaders of all major political parties
    in Romania. However, with the uncertainty of recent political change,
    together with the local elections and a Government focused on internal
    domestic (as well as EU related) matters, the Company has scaled back
    considerably its media communication efforts. 
    
--  In its latest combined political programme the new Government has stated
    it will re-analyze the Project in a transparent manner and based on an
    open and democratic dialogue, so that the decisions are in accordance
    with the national interest, environmental protection and European
    legislation. In recent media coverage the Prime Minister and others in
    the new Government are reported to be keen to ensure that the Project
    benefits from the existence of environmental protection guarantees, de-
    classification of the mining licence as a state secret so it can be made
    public, a renegotiation of the Romanian State's participation and a
    decoupling of the Project from political lobbying. 
    
--  The Company is looking forward to having an open dialogue with the new
    Government to understand and discuss any and all issues and concerns in
    relation to the Project and will continue to pursue a strategy of
    engagement with all stakeholders, to explain the critical importance of
    the Project as part of the sustained economic development for Romania,
    and its commitment to adhere to the highest standards on engineering,
    environmental, cultural and social matters. 

 

Project Ownership and Royalty Rates

--  The Company has previously reported its understanding that the previous
    Government was reviewing the royalty regime for extractive industries
    and that on March 30, 2012, the then Government confirmed that there has
    been no adoption of any legislative change in royalty rate for mineral
    resources although the royalty regime should be reviewed further in the
    short-term.  

--  On July 31, 2012 it was reported that Mr. Ponta had requested a
    resumption of the legislative approval process of proposed amendments to
    the royalty rates applicable to certain resources including precious
    metals. 

--  There have been no discussions with the new Government installed in
    early May 2012 on the issues of Project ownership and royalty rates. The
    Company will provide further updates as and when matters are progressed.

 

Environmental/Permitting

--  As a consequence of the recent political changes, the Company awaits
    further clarification from the new Government and the TAC as to whether
    further meetings or documentation will be requested and the next steps
    in its review process. Gabriel remains unable to provide guidance on the
    time that it might take the TAC to vote on the EIA or to release its
    recommendation to the Government. Ultimately, the environmental permit
    must be approved by a Cabinet decision of the Government prior to its
    issuance. 

--  As result of the ongoing delays to the permitting process, one of the 19
    endorsements to the Company's amended industrial zonal urbanism plan
    ("Industrial Area PUZ"), which designates an industrial zone under the
    footprint of the proposed new mine at Rosia Montana, has expired and a
    further endorsement is approaching expiry in August 2012. The equivalent
    endorsement for the zonal urbanism plan for the Rosia Montana historical
    protected area ("Historical Area PUZ") has also expired. In due course
    the Company plans to submit the necessary documents to obtain new
    endorsements. 

--  The validity of the existing General Urbanism Plans ("PUGs") for Rosia
    Montana and Abrud has recently been extended, pursuant to local council
    decisions, through to July 2014 in both cases. Furthermore, RMGC has
    recently obtained an extension to the validity of its urbanism
    certificate, UC-87, for a period until April 2013. 

 

Archaeology and Preservation of Cultural Heritage

--  The Company has continued maintenance work on 160 houses located in the
    historical center of the village of Rosia Montana ("Protected Area"),
    with the aim of preventing their deterioration. During 2012, the
    restoration of several of these houses has been completed and these are
    now in use. Whilst these village houses are not designated as historic,
    the restoration will contribute to maintaining the character of the
    village. 
    
--  To date, the design work for the first phase of more than 50 houses
    within the Protected Area has been completed and the design work for the
    second phase of approximately 60 houses is at a final draft stage. The
    permitting process for obtaining construction and restoration
    authorizations continued in Q2 2012 and is now in its final stages. 
    
--  RMGC, in partnership with the local council of Rosia Montana, is
    progressing the restoration of two iconic buildings (the old school
    house and former town hall) in the Protected Area, along with the
    rehabilitation of a number of houses, which will be used for tourism
    initiatives. The restoration of the former town hall is scheduled for
    completion during Q3 2012. The remaining restoration works are planned
    to be scaled back until such time as the new Government moves ahead with
    Project permitting. 
    
--  RMGC has continued further detailed archaeological work in the old
    underground Roman mining galleries that lie under the Protected Area.
    This work has focused on restoring previously unexplored galleries with
    a view to opening them as a permanent museum, a visible testimony to the
    2,000 year mining history at Rosia Montana and an accessible example of
    historical mining activities for parties with interests in the regional
    mining sector. One such example is the Catalina Monulesti underground
    mining gallery which is in the process of being successfully restored
    and opened to the public. 

 

Corporate and Social Responsibility (CSR)

--  Gabriel takes pride in its commitment to achieving the highest levels of
    sustainability from workplace safety to community and environmental
    responsibility. It has a clear goal of attaining business performance
    through a dynamic process of continuous improvement in all aspects of
    its business and respecting all stakeholders. The Company invests
    significant resources into its CSR programs, which in Romania is a
    multi-dimensional commitment managed by RMGC covering employee training
    and safety, local communities, living traditions, direct and indirect
    social impacts, educational programs, environmental protection,
    community sponsorship and heritage aspects. 
    
--  RMGC currently employs approximately 500 people directly and numerous
    others indirectly, with approximately 85% hired from the local Rosia
    Montana community, and the Company is investing in training and skills
    assessments for the construction phase of the Project. 
    
--  In the second quarter of 2011, the Company commenced the construction of
    a church at the Recea resettlement site. This church program achieved
    practical completion during Q2 2012, with internal finishing scheduled
    after an appropriate drying out period. The construction of three new
    houses at the Recea site was also completed in Q2 2012. 
    
--  A definitive review of the Recea expansion project is nearing completion
    and a feasibility study is also in progress for a further resettlement
    village to be built close to Rosia Montana for the remaining homeowners
    who have chosen, or may choose, to be resettled in the Rosia Montana
    area. 

 

Litigation

--  Over the years certain foreign and domestically-funded non-governmental
    organizations ("NGOs") have initiated a multitude of legal challenges
    against licenses, permits, authorizations and approvals obtained for the
    exploration and development of the Project.  
    
--  The publicly stated objective of the NGOs in initiating and maintaining
    these legal challenges is to use the Romanian court system not only to
    delay as much as possible, but to ultimately stop the development of the
    Project. While a small number of these actions over many years have been
    successful, most have been, and continue to be proved to be, frivolous
    in the Romanian courts. RMGC recently achieved the 16th court victory
    for the Project from 17 legal challenges since 2010. 
    
--  Cases concluded during the second quarter of 2012 include: 
    
    --  On April 17, 2012, the Cluj Tribunal rejected the NGOs' claim for
        the annulment of the urbanism certificate UC-87. This judgment can
        no longer be appealed and is thus irrevocable. 
        
    --  On April 4, 2012, the Alba Iulia Court of Appeal ("AICA") upheld the
        ruling of a lower court that a 2009 decision of the local council of
        Rosia Montana ("LCD 1/2009") had been illegally adopted by the local
        council of Rosia Montana and was invalid (the "AICA Decision").
        However, in a written judgment delivered on May 17, 2012, the AICA
        confirmed that the 2002 urbanism plan approvals remained in full
        force and effect. Thus, the Romanian courts have confirmed that the
        urbanism plans currently in place for the Project remain legal and
        valid and have been since their approval in 2002. 
        
    --  A second legal challenge which also sought the suspension of LCD
        1/2009 was irrevocably dismissed by the Cluj Tribunal on June 6,
        2012 on the basis that the subject matter of the claim had been
        ruled upon by the AICA. A third case relating to LCD 1/2009 was
        initiated by two other NGOs but the action was suspended in October
        2011 pending the above-mentioned case being irrevocably settled by
        the AICA. The NGOs may request the continuance of the cancellation
        action in due course. 
        
    --  On June 19, 2012 RMGC obtained a favorable ruling in an appeal
        before the High Court of Cassation and Justice, the supreme court of
        Romania, on the legal challenge originally commenced by RMGC in
        November 16, 2007 to compel the Ministry of Environment to resume
        the EIA review. The Company awaits the written ruling of the High
        Court of Cassation and Justice in order to determine its next steps
        in these legal proceedings. As part of the proceedings before the
        High Court of Cassation and Justice, RMGC sought to discontinue its
        related claim for monetary damages against the Ministry of
        Environment and its former officials. RMGC awaits confirmation of
        the consent to the discontinuance of this claim. 

--  Upcoming hearings in the third quarter of 2012 include: 
    
    --  A claim seeking the cancellation of the Strategic Environmental
        Assessment endorsement ("SEA"), which was issued by the Regional
        Agency for Environmental Protection of Sibiu in March 2011, is
        scheduled to be heard on September 14, 2012. The SEA is a key
        endorsement in respect of the Industrial Area PUZ. 
        
    --  A second case seeking the suspension of the SEA, initiated by an NGO
        through the Cluj Tribunal, is also scheduled to be heard on
        September 14, 2012. 
        
    --  On September 10, 2012 a request filed by three NGOs with the Cluj
        Tribunal for the cancellation of the ADC issued in July 2011 for the
        Carnic open-pit is scheduled to be heard. On January 20, 2012, the
        same three NGOs filed a claim in the Cluj Tribunal seeking the
        suspension of the ADC and the next hearing of that case is scheduled
        for September 14, 2012. 
        
    --  An action initiated by an individual who is seeking a declaration of
        ownership title over 37 hectares of land under the footprint of the
        Project which is the subject of a concession agreement between the
        Abrud city administration and RMGC. 

--  Due to the inherent uncertainties of the judicial process, the Company
    is unable to predict the ultimate outcome or impact, if any, with
    respect to matters challenged in the Romanian courts. In all
    circumstances, the Company and/or RMGC will vigorously maintain its
    legal rights and will continue to work with local, county and federal
    authorities to ensure the Project receives a fair and timely evaluation
    in accordance with Romanian and EU laws. However, there can be no
    assurance that the Company and/or RMGC (as the case may be) will prevail
    in these matters. If any claims are not resolved in the Company's or
    RMGC's favour, then such a negative ruling may have a material adverse
    effect on the timing and/or outcome of the permitting process for the
    Project and the Company's financial condition. The implications of a
    negative court ruling will only be known once such a decision is issued
    and the position of the Government is assessed. 

 

Outlook

--  The Company's key objectives in the short term include to: 
    
    --  Reduce substantially monthly costs until such time as the new
        Government moves ahead with Project permitting; 
        
    --  Continue efforts to increase the Romanian public and Government
        awareness of the Project benefits, economic and otherwise, and
        support for the permitting of the Project; 
        
    --  Complete the revised estimate of capital and operating costs of
        developing the Project, such that a new NI 43-101 technical report
        can be issued; 
        
    --  Obtain approval of the EP and all other required permits that allow
        construction activities to commence; and 
        
    --  Maximize shareholder value, while optimizing the Project benefits to
        those in the community and the surrounding area. 

 

Forward-looking Statements

This press release contains forward-looking information as defined in applicable securities laws relating to the Company and/or the Project (referred to herein as "forward-looking statements") that are based on management's current expectations, estimates and projections. Specifically, this press release contains forward-looking statements regarding the returns to Romania of a change in equity and royalty rates applicable to the Project. All statements other than statements of historical facts included herein, including without limitation, those incorporated by reference, those which may refer to the Company's financial position, business strategy, plans, objectives of management for future operations (including development plans and objectives relating to the Company's business) the economic impact, job creation, costs estimates, patrimony plans, future ability of the Company to finance the Project, Project delivery and estimates regarding the timing of completion of various aspects of the Projects' development or of future performance are forward-looking statements. 

The words "believe", "expect", "anticipate", "contemplate", "target", "plan", "intends", "continue", "budget", "estimate", "projects", "may", "will", "schedule", and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that are inherently subject to significant business, economic and competitive uncertainties and contingencies. 

Forward-looking statements are not guarantees of future performance and are subject to known and unknown risks, uncertainties and other factors which are difficult, or may be beyond Gabriel's ability, to predict or control and that may cause the actual outcomes, level of activity, financial results, performance or achievements to differ materially from those expressed or implied by the forward-looking statements, These risks, uncertainties and other factors include, without limitation, changes in the worldwide price of precious metals; fluctuations in exchange rates; legislative, political or economic developments including changes to mining and other relevant legislation in Romania; geopolitical uncertainty, uncertain legal enforcement; changes in, and the effects of, the government policies affecting the Company's operations; uncertainties related to timelines for awaited approvals; changes in general economic conditions, and the financial markets; operating or technical difficulties in connection with exploration, development or mining; environmental risks; the risks of diminishing quantities or grades of reserves; and the Company's requirements for substantial additional funding.

Accordingly, readers should not place undue reliance on forward-looking statements. Gabriel undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.

Contacts

Jonathan Henry
Gabriel Resources Ltd.
President and Chief Executive Officer
Mobile: +44 7798 801783
jh@gabrielresources.com

Max Vaughan
Gabriel Resources Ltd.
Chief Financial Officer
Mobile: +44 7823 885503
max.vaughan@gabrielresources.com

Bobby Morse
Buchanan
+44 207 466 5000 or Mobile: +44 7802 875227
bobbym@buchanan.uk.com

Search